{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002381,"name":"Time limit","dataset":"planning-condition","typology":"policy","reference":"U0118614","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"This condition is imposed because the use of the site for public open space has been approved for a temporary 5 year period, pending redevelopment of the site.","description":"The site shall be in use as public open space for a maximum period of 5 years from the date it is first made available to the public. The Local Planning Authority shall be informed of the opening date prior to first use commencing. Within 6 months from the date of this expiry or should any part of the site cease to be used as public open space before that date, a scheme of restoration shall be submitted to the Local Planning Authority to be approved in writing. The scheme shall include details of the following measures: Landscaping Equipment Easement areas to existing site constraints Boundary treatments Maintenance strategy The scheme of restoration shall be carried out within the first available planting season following the approval of details by the Local Planning Authority. The scheme shall be carried out and maintained in accordance with the agreed details."}