{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002321,"name":"Ecological enhancement plan","dataset":"planning-condition","typology":"policy","reference":"U0118423","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29","description":"Within one month of the commencement of development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: Photographic evidence of the implementation of the measures must be submitted to the local planning authority. - One swift box of the Vivara Pro Woodstone type or similar, to be located on the northeast or northwest aspect of the building above 5m on walls away from trees. -One bat box of the Vivara Pro Woodstone to be sited above 4 m at south or southwest locations on the new building"}