{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002248,"name":"Drainage Details","dataset":"planning-condition","typology":"policy","reference":"U0117973","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"Within 3 months of the date of this decision, details of the surface water and land drainage systems and all related works necessary to drain the site shall be submitted to and approved in writing by the Local Planning Authority. These works shall be operating in accordance with the approved details."}