{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002247,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0117972","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref 93233-PremierModular-CoppiceSch, dated October 2023, compiled by UNDA) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.475 meters above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}