{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002211,"name":"Restoration time limit","dataset":"planning-condition","typology":"policy","reference":"U0117865","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the restoration operations are tied to the planning permission in the interests of protecting the South Yorkshire Green Belt and local amenity.","description":"All restoration operations shall be completed no later than 2 years from the date of cessation of the importation of restoration material into the site as notified to the Waste Planning Authority under condition 3."}