{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001915,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0116166","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Sheet Name: Location and Block Plan. Date: 02/11/23. Project Number: 1681. Drawing Number: BL101. Sheet Name: Proposed Elevations. Date: 02/11/23. Project Number: 1681. Drawing Number: P104. Sheet Name: Proposed FF Plan. Date: 02/11/23. Project Number: 1681. Drawing Number: P102. Sheet Name: Proposed GF Plan. Date: 02/11/23. Project Number: 1681. Drawing Number: P101. Sheet Name: Proposed SF Plan. Date: 02/11/23. Project Number: 1681. Drawing Number: P103."}