{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001894,"name":"Flood risk","dataset":"planning-condition","typology":"policy","reference":"U0116046","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"o To reduce the risk of flooding to the proposed development and future occupants","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref Flood Risk Assessment Report / rec'd July 2023) and the following mitigation measures it details: o Finished floor levels shall be set no lower than existing levels at ground and upper floors, as per Pg11: Recommendations of the FRA o More vulnerable (residential) development will be limited to the first floor and above, as per Pg11: Recommendations of the FRA o Flood resilience and resistance measures shall be included as per Pg11: Recommendations of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}