{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001778,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0115641","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. NEBS0219_010 - Design and Access Statement, Gleeds, dated 12/09/2023 - Proposed Elevations, drawing no. NEBS0219_008, Rev. T03 - Proposed Roof Plan, drawing no. NEBS0219_011, amended version received 10/10/2023 - Proposed Plans: Windows and Doors, drawing no. NEBS0219_002, Rev. T01 - Proposed Trespa Meteon Cladding Details - Material Property Datasheet - Proposed Alumasc Roofing Specification Details, project ID SP131179, dated 03/10/2023 - A2 Panel details - Kooltherm K15 rainscreen board details, 24th issue, July 2023 - Solar PV Proposal details - CorEnergy - PURe Doors NBS L20 specification, SAS - PURe Windows NBS L10 specification, SAS"}