{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001574,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0114605","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants and to ensure the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment.","description":"The development shall be carried out in accordance with the submitted flood risk statement compiled by Building Link Design Architects (13/09/23) and the following mitigation measures it details: - Finished Floor levels of the ground floor will be no lower than 2.88 meters above Ordinance Datum (mAOD); - There shall be no sleeping accommodation located on the ground floor of the development; - Flood resilience measures will be incorporated up to a minimum of 4.4 mAOD; and - Electrical sockets will be raised to a minimum of 4.4 mAOD. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}