{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001570,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0114601","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Sheet Name: Location and Block Plan (Proposed Site Plan). Date: 14/08/2023. Project Number: 1976. Drawing Number: BL 101. Sheet Name: Proposed GF Plan. Date: 14/08/2023. Project Number: 1976. Drawing Number: P101. Sheet Name: Proposed FF Plan. Date: 14/08/2023. Project Number: 1976. Drawing Number: P102. Sheet Name: Proposed Elevations. Date: 14/08/2023. Project Number: 1976. Drawing Number: P103."}