{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001518,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0114307","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Site Plan and Location Plan, 3122-004, Revision F - received 11/10/2023 Demolition Roof Plan 3122-002 - received 06/06/2022 Proposed Ground Floor Plan, 3122-005, Revision H - received 01/08/2023 Proposed First Floor Plan, 3122-006, Revision I - received 01/08/2023 Proposed Elevations, 3122-007, Revision H - received 21/08/2023 Street Elevation and Perspective 3122-008A - received 18/10/2022 Boundary Walls & Entrance Gate 3122-009A - received 18/10/2022 Street Elevation and Perspective 3122-0010A - received 18/10/2022 Proposed Landscape Plan 3122-0011A - received 06/01/2023 Annex Section 3122-012 - received 03/11/2022 Design and Access Statement Rev A - received 18/10/2022 Biodiversity Net Gain Report Rev A - received 06/01/2023 Biodiversity Metric 3.1 v.3 - received 06/01/2023 Tree Protection Plan 1424-003B - received 06/01/2023"}