{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001443,"name":"Accordance with Plans Specified","dataset":"planning-condition","typology":"policy","reference":"U0113940","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: Drawing No. 221LA_LP_06_23 as received 13/06/2023 Site Plan: Drawing No. 221LA_LP_06_23 as received 13/06/2023 Proposed Elevations: Drawing No. 221LA_PrEL_06_23 as received 23/06/2023 Proposed Floor Plans: Drawing Nos. 221LA_PrFP_05_23 & 221LA_PrAFP_05_23 as received 13/06/2023"}