{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001437,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0113912","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans (Including Location and Site Plans) - Drawing No. 02, Revision 02, as received 05/10/2023 Proposed Plans (Including Section and First Floor) - Drawing No. 03, Revision 02 as received 19/07/2023"}