{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001341,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0113372","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: DRWG NO. TM-01-P16 Rev 03 Cable Route Site Location Plan received 20 June 2023 DRWG NO. TM-01-P17 33kV Tertiary Connection Cable Arrangement Between the NG Substation and the Solar Substation received 20 June 2023"}