{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001323,"name":"EA condition","dataset":"planning-condition","typology":"policy","reference":"U0113342","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and to prevent flooding elsewhere by minimising the risk of blockage as a result of the bridge.","description":"The development shall be carried out in accordance with the details referenced within the email from Peter Andrew to Roy Sykes (ref: Temporary Bridge, Evergreen, dated 9th August 2023) and the following mitigation measure shall be included: + The soffit level of the bridge shall be set no lower than 2.18 metres above Ordnance Datum, which provides a 1.00 metre freeboard above the design flood height. + The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}