{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001321,"name":"Ecol enhancement","dataset":"planning-condition","typology":"policy","reference":"U0113340","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29","description":"Within 1 month of the development having been completed, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the completion of all works. o Two bat boxes to be permanently attached to the underside of the bridge with the type location and fixing to be determined by a suitably qualified ecologist."}