{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001313,"name":"In accordance with plans specified","dataset":"planning-condition","typology":"policy","reference":"U0113327","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Site Plan: Drawing No. BL101, received 12/07/2023 Proposed Floor Plans (Ground Floor): Drawing No. P101, received 03/07/2023 Proposed Floor Plans (1st Floor): Drawing No. P102, received 03/07/2023 Proposed Plans Elevations Drawing No. P103, received 03/07/2023"}