{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001286,"name":"Ecological Enhancement Measures","dataset":"planning-condition","typology":"policy","reference":"U0113272","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Policy 29 of the Local Plan.","description":"Prior to the first use of the development, the ecological enhancement measures shown in the Ecological Enhancement Plan ([LM0170]A.6[REV A]EEP) included at Appendix A of the submitted Bat Survey Report prepared by LM Ecology, shall be installed. These measures shall thereafter be retained."}