{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001218,"name":"Net Rail within 10m","dataset":"planning-condition","typology":"policy","reference":"U0112960","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of protection of the operational railway as required by Policy CS14 of the Core Strategy.","description":"No excavations/piling/buildings are to be located within 10m of the railway boundary unless a method statement has been submitted to and agreed with the Asset Protection Manager of Network Rail and supplied to the Local Planning Authority. The development shall only be implemented and carried out in full compliance with that agreement. The requirements and contact details are listed in the Informative below."}