{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001015,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0112101","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Date received: 19/06/2023. Site Plan (existing). Date received: 19/06/2023. Site Plan (proposed). Date received: 19/06/2023. Proposed floor plans. Date received: 19/06/2023. Proposed elevation (side). Date received: 19/06/2023. Proposed elevation (front and rear). Date received: 19/06/2023."}