{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73001007,"name":"in accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0112062","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. FA-DR-03-101, Revision P2 - Proposed Site Plan, drawing no. FA-DR-03-103 - GA_Elevations_Overall-Proposed, drawing no. FA-DR-03-210, Revision P2 - GA_Plans&Elevations_Proposed, drawing no. FA-DR-03-215, Revision P4 - Design and Access Statement, March 2023"}