{"entry-date":"2026-10-30","start-date":"2026-10-30","end-date":"","entity":5110954,"name":"","dataset":"plan-timetable","typology":"timetable","reference":"Great-Yarmouth-Local-Plan-2045-gateway-1-self-assessment","prefix":"plan-timetable","organisation-entity":152,"geometry":"","point":"","quality":"authoritative","plan":"Great-Yarmouth-Local-Plan-2045","notes":"This new requirement is a self assessment summary confirming that we have published the timetable and notice, completed the scoping consultation, and have a project plan in place to begin the formal stage of preparing the Local Plan. Once we complete Gateway 1, we have 30 months to prepare and adopt the plan.","event-date":"2026-10-30","plan-event":"gateway-1-self-assessment","actual-date":"2026-10-30"}