{"geometry":{"type":"Point","coordinates":[0.063898,52.281724]},"type":"Feature","properties":{"entry-date":"2017-12-31","start-date":"2017-12-31","end-date":"","entity":1715727,"name":"17SC0009a","dataset":"brownfield-land","typology":"geography","reference":"17SC0009a","prefix":"brownfield-land","organisation-entity":281,"quality":"authoritative","notes":"Phase 2 of Northstowe Major Development Site, Brownfield element.. Development of Phase 2 of Northstowe with details of appearance, landscaping, layout, scale and access reserved (save for the matters submitted in respect of the Southern Access Road (West)) comprising: 1), construction haul route, engineering and infrastructure works; and 2) construction of a highway link (Southern Access Road (West)) between the proposed new town of Northstowe and the B1050, improvements to the B1050, and associated landscaping and drainage","hectares":"63.3","deliverable":"yes","site-address":"Land to the East of B1050 and Longstanton, West of the Cambridgeshire Guided Busway (CGB) and North of Oakington","site-plan-url":"https://gismaps.scambs.gov.uk/connect/analyst/mobile/#/main?mapcfg=BrownFieldRegister_New&queryTable=/NamedTables/SCDC_Brownfieldregister&queryColumn=Site_Reference&queryValues=17SC0009a","ownership-status":"unknown-ownership","planning-permission-date":"2017-01-08","planning-permission-type":"outline-planning-permission","planning-permission-status":"permissioned","planning-permission-history":"http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2011/14/OL"}}