{"entry-date":"2026-01-10","start-date":"2017-12-31","end-date":"","entity":1715643,"name":"RBBCBLR060","dataset":"brownfield-land","typology":"geography","reference":"RBBCBLR060","prefix":"brownfield-land","organisation-entity":264,"geometry":"","point":"POINT (-0.146476 51.163666)","quality":"authoritative","notes":"The site, as part of a wider site, has been allocated in the Development Management Plan as a Sustainable Urban Extension (DMP site allocation policy SEH4). Its delivery will be subject to DMP Policy MLS1 “Managing land supply.","hectares":"0.62","deliverable":"yes","site-address":"Land to the north of Woodside Works, Horley","site-plan-url":"https://shared.xmap.cloud?map=c85f728e-081a-453a-be7f-b7dde2cf8e2a&x=529696.5349999999&y=142123.925&z=20","ownership-status":"not-owned-by-a-public-authority","maximum-net-dwellings":"13","minimum-net-dwellings":"13","planning-permission-status":"not-permissioned","planning-permission-history":"https://planning.reigate-banstead.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=000P7YMVLI000"}