{"entry-date":"2021-12-12","start-date":"2021-12-12","end-date":"","entity":1712427,"name":"BLR2701","dataset":"brownfield-land","typology":"geography","reference":"BLR2701","prefix":"brownfield-land","organisation-entity":118,"geometry":"","point":"POINT (0.282041 52.237877)","quality":"authoritative","notes":"Construction of 19 dwellings with associated parking and amenity space and retention of existing offices on site. Site boundary relates only to part of site considered brownfield.","hectares":"0.52","deliverable":"yes","site-address":"Hillside Mill Quarry Ln Swaffham Bulbeck Cambridge CB25 0LU","site-plan-url":"https://eastcambs.gov.uk/sites/default/files/2024-12/BLR2701.pdf","ownership-status":"not-owned-by-a-public-authority","maximum-net-dwellings":"12","minimum-net-dwellings":"12","planning-permission-date":"2018-01-18","planning-permission-type":"full-planning-permission","planning-permission-status":"permissioned","planning-permission-history":"http://pa.eastcambs.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OSVGX6GGMEY00"}