{"entry-date":"2021-06-29","start-date":"2017-09-20","end-date":"2021-06-29","entity":1704487,"name":"MS02","dataset":"brownfield-land","typology":"geography","reference":"MS02","prefix":"brownfield-land","organisation-entity":311,"geometry":"","point":"POINT (-2.727647 53.700627)","quality":"authoritative","notes":"Hybrid planning application comprising of Full and Outline development - Environmental Impact Assessment (EIA) development Part A FULL - Site enabling works, the development of highway and drainage infrastructure for the full application site (the proposed development site) and the provision of car park accessed off Titan Way (Phase 1) and 197 dwellings and associated internal access roads, public open space, green infrastructure, an acoustic barrier and highway infrastructure (Phase 2)","hectares":"15.44","deliverable":"yes","site-address":"Moss Side Test Track, Aston Way/Titan Way (Phase 2)","site-plan-url":"https://www.southribble.gov.uk/content/housing-land-availability","ownership-status":"not-owned-by-a-public-authority","maximum-net-dwellings":"197","minimum-net-dwellings":"197","planning-permission-date":"2019-11-07","planning-permission-type":"full-planning-permission","planning-permission-status":"permissioned","planning-permission-history":"http://publicaccess.southribble.gov.uk/online-applications/"}