{"entry-date":"2020-12-31","start-date":"1995-01-01","end-date":"","entity":11500123,"name":"Temporary use of land etc for mineral exploration","dataset":"permitted-development-right","typology":"category","reference":"17J","prefix":"permitted-development-right","organisation-entity":600001,"geometry":"","point":"","quality":"authoritative","description":"Development on any land during a period not exceeding 28 consecutive days consisting of: (a) the drilling of boreholes; (b) the carrying out of seismic surveys; or (c) the making of other excavations, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations","documentation-url":"https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/17/crossheading/class-j-temporary-use-of-land-etc-for-mineral-exploration/made","permitted-development-right-part":"17","permitted-development-right-class":"J"}