{"geometry":{"type":"MultiPolygon","coordinates":[[[[-3.96807,53.907914],[-3.967165,53.908091],[-3.789902,53.942466],[-3.787258,53.942976],[-3.788678,53.976146],[-3.898707,54.007146],[-4.001951,54.059307],[-4.006706,54.061704],[-4.107786,54.079423],[-4.109149,54.078088],[-4.110911,54.076402],[-4.111701,54.075662],[-4.112268,54.075122],[-4.112632,54.07479],[-4.112708,54.074718],[-4.115479,54.072184],[-4.11569,54.071999],[-4.115782,54.071915],[-4.116701,54.071105],[-4.117364,54.070524],[-4.118777,54.069279],[-4.119325,54.068814],[-4.119664,54.068523],[-4.121483,54.066981],[-4.121574,54.066902],[-4.121698,54.0668],[-4.122159,54.066409],[-4.123205,54.065554],[-4.124363,54.064595],[-4.124812,54.064229],[-4.125636,54.063565],[-4.129173,54.060776],[-4.132802,54.058015],[-4.136526,54.055282],[-4.140307,54.052603],[-4.144181,54.049954],[-4.148139,54.04734],[-4.152158,54.044777],[-4.156258,54.042252],[-4.160432,54.039769],[-4.164681,54.037328],[-4.1661,54.036531],[-4.169047,54.034905],[-4.173433,54.032554],[-4.177888,54.030249],[-4.178873,54.029749],[-4.181171,54.028527],[-4.185628,54.02622],[-4.187034,54.025509],[-4.190218,54.023926],[-4.193484,54.022343],[-4.197063,54.019618],[-4.20078,54.016887],[-4.201502,54.016368],[-4.205197,54.013653],[-4.208982,54.010969],[-4.212847,54.008323],[-4.213468,54.007913],[-4.210843,54.006683],[-4.130027,53.968749],[-4.098713,53.954018],[-4.098195,53.953773],[-4.073617,53.95219],[-4.065425,53.951661],[-4.065217,53.951566],[-3.978503,53.911497],[-3.978385,53.911446],[-3.969144,53.907705],[-3.96807,53.907914]]]]},"type":"Feature","properties":{"entry-date":"2026-10-24","start-date":"2024-04-24","end-date":"","entity":11100000297,"name":"Morgan Offshore Wind Project: Generation Assets","dataset":"infrastructure-project","typology":"geography","reference":"EN010136","prefix":"infrastructure-project","organisation-entity":14,"quality":"authoritative","description":"Development of an offshore wind farm with an approximate capacity of 1500MW in the Irish Sea awarded as part of the Round 4 Offshore Wind Licensing Arrangements. The key components of the Morgan Generation Assets include: * Offshore wind turbines * Offshore Substation Platforms (OSPs) * Foundations (for wind turbines and OSPs) * Scour protection * Cable protection * Inter-array cables linking the individual turbines to the OSPs * Offshore interconnector cables","documentation-url":"https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010136","infrastructure-project-type":"EN01 - Generating Stations","infrastructure-project-decision":"post-decision"}}