{"geometry":{"type":"MultiPolygon","coordinates":[[[[-3.137381,51.207369],[-3.137849,51.210362],[-3.141277,51.210058],[-3.144204,51.214729],[-3.168262,51.236054],[-3.180171,51.233324],[-3.1471,51.209829],[-3.153696,51.209373],[-3.156424,51.212241],[-3.156292,51.212479],[-3.156622,51.213531],[-3.160885,51.213003],[-3.160438,51.211581],[-3.158507,51.211572],[-3.156505,51.209466],[-3.155724,51.209139],[-3.151079,51.200872],[-3.151668,51.19914],[-3.149277,51.194329],[-3.147463,51.193184],[-3.147522,51.19273],[-3.146129,51.192906],[-3.146574,51.193725],[-3.146317,51.193785],[-3.146832,51.194623],[-3.141469,51.195188],[-3.140422,51.195135],[-3.139853,51.19563],[-3.140408,51.196417],[-3.136236,51.1971],[-3.137531,51.200585],[-3.137846,51.200557],[-3.137787,51.201324],[-3.138916,51.201225],[-3.138686,51.200461],[-3.139862,51.200375],[-3.140442,51.201658],[-3.137119,51.202421],[-3.136923,51.202697],[-3.136684,51.202627],[-3.135241,51.204574],[-3.137035,51.207099],[-3.135854,51.207111],[-3.135974,51.207633],[-3.136658,51.207622],[-3.137381,51.207369]]]]},"type":"Feature","properties":{"entry-date":"2026-10-24","start-date":"","end-date":"","entity":11100000106,"name":"Hinkley Point C New Nuclear Power Station Material Change 1","dataset":"infrastructure-project","typology":"geography","reference":"EN010102","prefix":"infrastructure-project","organisation-entity":14,"quality":"authoritative","description":"Removal of requirement to install Acoustic Fish Deterrent system (associated with cooling water intake heads) amendments to the Interim Spent Fuel Store and Meteorological Mast, addition of new Hinkley Point Substation and Sluice Gate Storage Racks.","documentation-url":"https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010102","infrastructure-project-type":"EN01 - Generating Stations","infrastructure-project-decision":"pre-application"}}