{"geometry":{"type":"Point","coordinates":[-0.199484,51.550672]},"type":"Feature","properties":{"entry-date":"2025-09-09","start-date":"","end-date":"","entity":10000037767,"name":"","dataset":"planning-application","typology":"geography","reference":"2012/0944/L","prefix":"planning-application","organisation-entity":"90","quality":"","description":"Installation of smoke benting equipment including glazed vent at roof level and duct and vent from second floor to roof level, and internal alterations including works to screen at second floor level all in connection with existing school (Class D1).","address-text":"BECKFORD PRIMARY SCHOOL DORNFELL STREET LONDON NW6 1QL","decision-date":"2012-04-03","planning-decision-type":"Granted","planning-application-status":"Final Decision"}}