{"geometry":{"type":"Point","coordinates":[-0.116566,51.520153]},"type":"Feature","properties":{"entry-date":"2025-09-09","start-date":"","end-date":"","entity":10000035992,"name":"","dataset":"planning-application","typology":"geography","reference":"2024/0754/L","prefix":"planning-application","organisation-entity":"90","quality":"","description":"Minor interior modifications to two existing basement office rooms, involving the removal of a modern plasterboard ceiling & stud partition dividing the space, relocation of an existing door set, new electrical installations, wiring, lighting, decoration, joinery & flooring. Replacement of a modern 80 x 80 SHS post supporting an existing oak beam with a larger 100 x 100 SHS supporting a new steel beam to the underside of the exisitng oak beam (which is not altered). Steel supports concealed with plasterboard.","address-text":"29-31 Bedford Row Chambers Bedford Row London Camden WC1R 4HE","decision-date":"2024-03-21","planning-decision-type":"Granted","planning-application-status":"Final Decision"}}