{"geometry":{"type":"Point","coordinates":[-0.280891,50.831848]},"type":"Feature","properties":{"entry-date":"2025-09-07","start-date":"2015-11-02","end-date":"","entity":10000008242,"name":"","dataset":"planning-application","typology":"geography","reference":"AWDM/1614/15","prefix":"planning-application","organisation-entity":"26","quality":"","description":"Improvements to 1.8km of tidal defences on the east bank between Coronation Green and the A27 road bridge and 5.4km of defences on the west bank between Shoreham Old Fort and Shoreham Toll Bridge. Proposed development (referred to as the Shoreham Adur Tidal Walls scheme) consists of seven reaches on the west bank (designated W1 - W7 inclusive) and three reaches on the east bank (designated E1 - E3 inclusive). The proposed defences include steel sheet piling, concrete walls, flood glass and earth embankments. Additional works to include a section of road raising, scour protection in the form of rock revetment, matting, planted terraces and gabions and the creation of 1.3 ha of intertidal salt marsh in reach W7 and landscape improvements at Town Quay and the Shoreham Old Fort car park. The application is accompanied by an Environmental Impact Assessment.","address-text":"Foreshore North Of Adur Outdoor Activities Centre And East And West Of River Adur Brighton Road Shoreham-By-Sea West Sussex","decision-date":"2016-06-01","documentation-url":"http://planning.adur-worthing.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=NXCKDTCB05900","planning-decision":"Approve","planning-decision-type":"Committee","development-classification":"http://opendatacommunities.org/def/concept/planning/application/6000/6006"}}