{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008784,"name":"replacement maintenance","dataset":"planning-condition","typology":"policy","reference":"U0119316","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To help the tree become established and to ensure any failure is replaced.","description":"When planted the Hornbeam tree must be adequately staked, tied, protected and maintained for a period of three years. During that period all losses must be made good."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008785,"name":"In accordance with plans","dataset":"planning-condition","typology":"policy","reference":"U0119325","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing number LP01 dated Feb 2022 (Location Plan) Drawing number SL01 Rev P20 dated 24.07.23 (Site plan) Drawing number MB01 Rev F dated 24.07.23 (Materials and boundary treatment) Drawing number 04 Rev A dated 02.03.23 (Boundary treatment details) Drawing number SX01 Rev A dated 02.03.23 (Site section) Drawing number 2151/03/SK08 Rev D dated 28.07.23 (Finished floor levels) Drawing number SS01 Rev C dated 16.06.23 (Street scenes) Drawing 21036_HT_03_C dated January 2021 (House type NT1 Detached) Drawing 21036_HT_06_C dated January 2021 (House type NT2 Detached) Drawing 21036_HT_08_C dated January 2021 (House type NT3) Drawing 21036_HT_01_A dated January 2021 (House type HL70) Drawing 21036_HT_02_B dated January 2021 (House type HL85) Drawing 21036_HT_11_B dated February 2023 (House type HL86) Drawing 21036_HT_07_C dated January 2021 (House type HL108) Drawing 21036_HT_05_B dated January 2021 (House type HL109 Elevations) Drawing 21036_HT_04_C dated January 2021 (House type HL109 Floor plans) Drawing 21036_HT_10_A dated February 2023 (House type HL110 Elevations) Drawing 21036_HT_09_B dated February 2023 (House type HL110 Floor plans) Drawing number 58301-BBA-01-XX-DR-A-0281 Rev P02 dated 07/06/23 (Flat type A1 M4(2) floor plan) Drawing number 58301-BBA-01-XX-DR-A-0280 Rev P02 dated 07/06/23 (Flat type A1 M4(3) floor plan) Drawing number 58301-BBA-01-XX-DR-A-0283 Rev P02 dated 09/09/22 (Flat type A2 floor plan) Drawing number 58301-BBA-01-XX-DR-A-0283 Rev P02 dated 09/09/22 (Flat type A3 floor plan) Drawing number 583/01-BBA-XX-ZZ-DR-A-0217 Rev A dated 03/05/23 (Elevations of apartments) Drawing number 583/01-BBA-XX-ZZ-DR-A-0218 Rev A dated 03/05/32 (Elevations of apartments) Drawing number 583/01-BBA-XX-00-DR-A-0210 Rev A dated 03/05/23 (Level 0 Ground floor plan of apartments) Drawing number 583/01-BBA-XX-01-DR-A-0211 Rev A dated 03/05/23 (Level 1 first floor plan of apartments) Drawing number 583/01-BBA-XX-02-DR-A-0212 Rev A dated 03/05/23 (Level 2 second floor plan of apartments) Drawing number 583/01-BBA-XX-00-DR-A-0220 Rev A dated 03/05/23 (Type B1 bungalow floor plan) Drawing number 583/01-BBA-XX-00-DR-A-0221 Rev B dated 11/07/23 (Type B2 bungalow floor plan) Drawing number 583 01-BBA-XX-00-DR-A-0222 Rev A dated 03/05/23 (Elevations of bungalows plots 39 to 42 and 47 to 48) Drawing number 583/01-BBA-XX-XX-DR-A-0224 Rev A dated 03/05/23 (Elevations of bungalows plots 43 to 46) Drawing number 583/01-BBA-XX-0-DR-A-0223 Rev A dated 03/05/23 (Elevations of bungalows plots 49 to 51) Drawing number 583/01-BBA-XX-00-DR-A-0222 dated 02/15/22 (Elevations of bungalows plots 64 to 69) Drawing number 583/01-BBA-XX-0-DR-A-0223 dated 02/15/22 (Elevations of bungalows plots 70 to 72) Drawing number 583/01-BBA-XX-XX-DR-A-0224 dated 02/22/22 (Elevations of bungalows plots 73 to 76)"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008786,"name":"Cycle storage","dataset":"planning-condition","typology":"policy","reference":"U0119326","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that satisfactory facilities for the parking of cycles are provided and to encourage travel by means other than private motor vehicles and to comply with policy 13 of the Doncaster Local Plan.","description":"The development (excluding the necessary site clearance, remediation and site preparation works) hereby permitted shall not be commenced until details of secure cycle parking facilities for the occupants of, and/or visitors to the development have been submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the occupation of the development hereby permitted and shall thereafter be retained for use at all times."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008787,"name":"Construction Method Statement","dataset":"planning-condition","typology":"policy","reference":"U0119327","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety.","description":"No development (excluding the necessary site clearance and remediation works) shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) - the parking of vehicles of site operatives and visitors ii) - loading and unloading of plant and materials iii) - storage of plant and materials used in constructing the development iv) - the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) - wheel washing facilities vi) - measures to control noise and the emission of dust and dirt during construction vii) - a scheme for recycling/disposing of waste resulting from demolition and construction works"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008788,"name":"Landscaping","dataset":"planning-condition","typology":"policy","reference":"U0119328","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of environmental quality and Local Plan policy 48.","description":"No development (excluding the site clearance, remediation and site preparation works) shall take place on the site until a detailed hard and soft landscape scheme based on the approved landscape masterplan (Drawing No: DR-5903-02.01 Rev C dated 18.07.23 and Drawing No: DR-5903-02.02 Rev C dated 18.07.2023) has been submitted to and approved in writing by the Local Planning Authority. The hard landscape scheme shall include details of all external hard surfacing materials, including adoptable highway finishes and footpaths through POS. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a detailed specification and cross-sections for tree pit/highway buildouts construction for the trees within highway that utilises a professionally recognised method of construction to provide the minimum rooting volume set out in the Council's guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation, details of management and maintenance for a minimum of 5 years following practical completion of the landscape works and the Shapefile/s for the locations of the individual trees within the planting scheme. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping for any individual housing plot must be implemented in full accordance with the approved scheme, prior to occupation of the home, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008789,"name":"Landscaping implementation","dataset":"planning-condition","typology":"policy","reference":"U0119329","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure site landscaping works are undertaken as approved in accordance with Policy 48.","description":"Following the commencement of the development and before 30th September of every year during the implementation period (either phased or in full) and 5 year aftercare period, a 'Landscaping Implementation Report' shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the landscaping has been carried out in full accordance with the approved landscaping details. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next 12 months. It shall cover the following matters in particular, but not limited to, species, size, location, planting and aftercare specification, and be illustrated with evidence such as an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, before and after photos of any remedial plantings or completed works. If required, the developer shall arrange to attend a site meeting with the Local Planning Authority to inspect the planting and ongoing maintenance requirements."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008790,"name":"Utilities and trees","dataset":"planning-condition","typology":"policy","reference":"U0119330","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure appropriate design of tree's within the adoptable public highway and avoid any potential design conflicts with utilities to meet Local Plan Policy 48.","description":"Prior to the commencement of above ground works and the signing of any S38 agreement, details of the proposed tree pits and utilities siting and alignments within the adoptable highway shall be submitted to and agreed in writing by the Local Planning Authority. This shall include a detailed specification for tree pit construction that utilises either grass verges or a professionally recognised crate system construction to provide the minimum rooting volume set out in the Council's Transitional Developer Guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation; a timescale of implementation, and where required a maintenance specification until trees are adopted by the Council. To minimise future conflict with utilities in new developments, where trees are proposed within the footway or highway build outs, the creation of a common utility enclosure with the necessary provisions for safely including both mains services and ducting should be considered in the utility design. This is preferably located adjacent to the property front boundary, under the footway, to facilitate service connections. The developer is to consider the requirements of National Joint Utilities Group guidance volume 4 with regard to the installation of trees and the required installation and maintenance of statutory undertaker's apparatus. http://streetworks.org.uk/wp-content/uploads/V4-Trees-Issue-2-16-11-2007.pdf Thereafter, the landscape scheme and utility design shall be implemented in full accordance with the approved details, with the crating system laid prior to any utilities. The Local Planning Authority shall be notified prior to the backfilling of any engineered tree pits to inspect and confirm compliance and within seven days of the completion of landscape works to inspect and approve practical completion in writing."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008791,"name":"Tree protection","dataset":"planning-condition","typology":"policy","reference":"U0119331","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that all trees are protected from damage during construction and adopted Doncaster Local Plan 2015 - 2035 Policy 32: Woodlands, Trees and Hedgerows section B.","description":"The erection of fencing for the protection of any retained tree shall be undertaken in accordance with the approved plans and particulars (reference DR-5903-02.01 - TREE PROTECTION PLAN) before any equipment, machinery or materials have been brought on to site for the purposes of the development, and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008792,"name":"Play area","dataset":"planning-condition","typology":"policy","reference":"U0119332","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate play facilities in accordance with policy 28 of the Local Plan.","description":"Prior to the occupation of any dwellings on site, a play area shall have been provided on the area of open space in accordance with a scheme previously approved in writing with the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008793,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0119333","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The development (excluding the site clearance, remediation and ground preparation works) hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3430&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3410&limit=10"},"count":5605}