{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008754,"name":"Restoration scheme","dataset":"planning-condition","typology":"policy","reference":"U0118861","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of biodiversity/ecology.","description":"Within 4 months of starting a new extraction phase or ending an old extraction phase (whichever date comes first) a detailed restoration scheme, based on Fig 3 of the Ecological Appraisal dated February 2011, shall be submitted to the Mineral Planning Authority for approval in writing. The restoration proposals will include details of all the habitats and features to be created in each phase of the restoration. The restoration proposals for each phase will then be implemented within 12 months of the aforementioned proposals receiving written approval from the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008755,"name":"Restoration and aftercare","dataset":"planning-condition","typology":"policy","reference":"U0118862","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is managed following restoration.","description":"Restoration and aftercare shall be carried out in accordance with the Ecological Appraisal prepared by Louise Hill dated February 2011 and the supplementary aftercare information submitted by Louise Hill to DMBC on 21st July 2011 together with the restoration contours shown on plan JMH/RO/AV/5 dated February 2011 unless otherwise approved in writing by the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008756,"name":"Stockpiles no more than 4m high","dataset":"planning-condition","typology":"policy","reference":"U0118863","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that dust emissions from the site are minimised.","description":"No mineral or soil stockpiles shall be formed to a height higher than 4 metres above the proposed ground levels unless otherwise approved in writing by the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008757,"name":"Buildings","dataset":"planning-condition","typology":"policy","reference":"U0118864","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of visual amenity and airport safeguarding.","description":"Unless otherwise approved in writing by the Mineral Planning Authority the buildings shall be 1 storey high and installed in accordance with the details submitted - specifically plan ref: JMH/RO/AV/2b and the details submitted pursuant to 'Secure Site Accommodation' with the height of the buildings not exceeding 2.5m. The colour shall be 'off-white'. The buildings shall be fitted with 'bird defender spikes' prior to installation on site and shall be maintained with such for the life of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008758,"name":"Removal of buildings, structures etc","dataset":"planning-condition","typology":"policy","reference":"U0118865","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of the proper restoration of the site.","description":"On the cessation of workings all buildings, plant, surface equipment, hard standing areas and internal haul roads shall be removed from the site within 6 months of the date of such cessation, unless otherwise approved in writing by the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008759,"name":"Approved documents on site","dataset":"planning-condition","typology":"policy","reference":"U0118866","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"For the avoidance of doubt.","description":"From the commencement of development to its completion a copy of the planning permission, including all plans and documents hereby approved and any plans and documents subsequently approved in accordance with this permission, shall be kept on site at all times."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008760,"name":"No fixed plant or buildings","dataset":"planning-condition","typology":"policy","reference":"U0118867","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of visual amenity and airport safeguarding.","description":"Notwithstanding the provisions of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that order with or without modification), no fixed plant or buildings other than those hereby permitted shall be erected or stored on the site without the prior written approval of the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008761,"name":"Environmental audit","dataset":"planning-condition","typology":"policy","reference":"U0118868","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To enable the site to be monitored.","description":"Between the 1st and 31st of January in each calendar year following the commencement of the development hereby permitted, the site operators shall supply the Mineral Planning Authority with an environmental audit, which shall provide the following details: o A current survey plan indicating the location of faces, benches and soil and subsoil heaps; o Volumes of soils and subsoil materials on site; o The progress of restoration; o Compliance with conditions; o Non-compliance with conditions."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008762,"name":"Maximum height - plant/machinery","dataset":"planning-condition","typology":"policy","reference":"U0118869","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of visual amenity and airport safeguarding.","description":"Unless otherwise approved in writing by the Mineral Planning Authority the maximum height of any plant or machinery shall not exceed 4 metres above ground level."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008763,"name":"Aftercare","dataset":"planning-condition","typology":"policy","reference":"U0118870","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is adequately managed following restoration in the interests of the agricultural resource.","description":"The period of aftercare shall commence following the placement of topsoil on any part of the site and shall extend for a minimum of 5 years effective management from the date of final topsoil restoration for the whole site as confirmed in writing by the Mineral Planning Authority."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3400&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3380&limit=10"},"count":5605}