{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008744,"name":"Working hours","dataset":"planning-condition","typology":"policy","reference":"U0118851","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the noise impact of the site is minimised.","description":"Unless otherwise approved in writing by the Mineral Planning Authority working hours shall be restricted to 07:00 to 19:00 hrs Mondays to Fridays; 07:30 - 12:00 hrs Saturdays with no working at all on Sundays, Public or Bank Holidays."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008745,"name":"Noise limits","dataset":"planning-condition","typology":"policy","reference":"U0118852","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the noise impact of the site is minimised.","description":"Noise limits at the following properties are set as follows: Woodside Nurseries 55 dBLAeq, 1hr Foxhill Farm 52 dBLAeq, 1hr Partridge Hill Farm 52 dBLAeq, 1hr"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008746,"name":"Noisy operations","dataset":"planning-condition","typology":"policy","reference":"U0118853","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the noise impact of the site is minimised and to effectively monitor compliance of site operations.","description":"Unless otherwise approved in writing by the Mineral Planning Authority, exceptionally noisy operations (as defined in the NPPF) such as soil stripping and replacement and baffle mound formation and removal shall be restricted to a maximum of eight weeks in any one year and shall be carried out only between the hours of: 0830 - 1730 hrs Mondays to Fridays 0930 - 1300 hrs Saturdays and at no time on Sundays or Bank Holidays or Public Holidays. Prior to such exceptionally noisy operations taking place the Mineral Planning Authority shall be notified in writing at least 2 days prior to such operations taking place."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008747,"name":"Vehicle alarms","dataset":"planning-condition","typology":"policy","reference":"U0118854","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the noise impact of the site is minimised.","description":"All vehicles operating at the quarry shall be fitted with broad band reversing alarms, or other reversing alarms as approved in writing by the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008748,"name":"Silencers to vehicles, plant, machinery","dataset":"planning-condition","typology":"policy","reference":"U0118855","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the noise impact of the site is minimised.","description":"Silencers shall be fitted to, used and maintained, in accordance with manufacturer's instructions, on all vehicles, plant and machinery used on the site. Equipment that develops any fault resulting in a noisy operation shall be immediately removed from use until the fault is remedied."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008749,"name":"Mounds","dataset":"planning-condition","typology":"policy","reference":"U0118856","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that dust emissions from the site are minimised and to ensure birds are not attracted to the site in the interest of airport safeguarding.","description":"All topsoil and subsoil storage mounds and any overburden mounds, which are to remain undisturbed for a period of 6 months, shall be seeded with a grass mix as soon as is practicable to prevent surface wind entrainment. Seeding of the mounds shall be carried out in accordance with the document entitled 'Birstrike and the Airport' (undated) prepared by John M. Hunt and submitted to Doncaster MBC on 12th October 2011."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008750,"name":"Access","dataset":"planning-condition","typology":"policy","reference":"U0118857","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of highway safety.","description":"Unless otherwise approved in writing by the Mineral Planning Authority or in the case of an emergency, access to the site shall be restricted to the access indicated on plan JMH/RO/AV/2b."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008751,"name":"Birdstrike","dataset":"planning-condition","typology":"policy","reference":"U0118858","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of airport safeguarding in relation to birdstrike.","description":"During the life of the development the site shall be operated in strict accordance with the 'Bird Management Plan and Restoration Guidance' (Ref: W6AV1000) produced by FERA, dated 9th December 2011, unless the requirements of Condition 12 below recommends amendments to this document, which shall be incorporated into a revised document."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008752,"name":"Site visits","dataset":"planning-condition","typology":"policy","reference":"U0118859","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of airport safeguarding in relation to birdstrike.","description":"From the commencement of the development, 'FERA' or any other company approved in writing by the Mineral Planning Authority shall carry out 'no-notice' site visits to the site in accordance with para. 2.1.4 of the Bird Management Plan (Ref: W6AV1000) prepared by FERA dated 9th December 2011. The frequency of the visits shall be initially every quarter for the first year of operations and following the visits, a report shall be prepared and submitted to the Mineral Planning Authority within 1 month of the visit being undertaken. For the remaining years of the quarry operation the frequency of 'no-notice' visits shall be determined by the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008753,"name":"Birdstrike","dataset":"planning-condition","typology":"policy","reference":"U0118860","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of airport safeguarding in relation to birdstrike.","description":"The development will be carried out in accordance with the supplementary information contained in the emails from John Hunt to DMBC dated 12th October 2011 (including the matters laid out in the attached document entitled 'Birdstrike and the Airport'); 10th February 2012 (12:59) and 13th February 2012 (13:27)."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3390&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3370&limit=10"},"count":5605}