{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008734,"name":"Application site","dataset":"planning-condition","typology":"policy","reference":"U0118841","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To define the extent of the planning permission already granted and the area to which the scheme of conditions shall apply.","description":"The development permitted by planning permission DC10, granted 14th May 1954 and the scheme of conditions hereby determined shall only relate to the area edged red on the plan entitled, Location Plan (included within the document entitled, Partridge Hill, Austerfield, Environment Act 1995, Application for Determination of Conditions, February 1997)."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008735,"name":"In accordance with approved details","dataset":"planning-condition","typology":"policy","reference":"U0118842","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development takes place in full accordance with the approved submission and planning conditions.","description":"The development permitted by planning permission DC10, granted 14th May 1954 shall only take place in accordance with the approved details as set out below, unless otherwise indicated by the conditions set out in this schedule of conditions which shall in all cases take precedence, or unless otherwise approved in writing by the Mineral Planning Authority: 1. Document entitled, Partridge Hill, Austerfield, Environment Act 1995, Application for Determination of Conditions, February 1997 (including location plan) 2. Letter from Tarmac dated 9th June 1997 (including the plan entitled 'Partridge Hill Farm, Austerfield, Test Pit Locations' and dated April 1992) 3. Additional aftercare details prepared by Louise Hill (MRB Ecology and Environment) dated 21st July 2011; 4. Noise assessment prepared by S&D Garritt (specifically para. 3.0) dated 26th August 2011; 5. Air Quality assessment prepared by Vibrock dated 31st August 2011 - in particular the details in Section 3 and the dust control measures detailed in Appendix C should be adopted by the operator throughout the life of the scheme; 6. Bird-strike mitigation plan and restoration guidance produced by FERA dated 9th December 2011; 7. The detail contained in the letters from Anthony Mulligan to Yorkshire Water dated 1st August 2011 and 9th November 2011; 8. Reptile mitigation measures detailed by Estrada Ecology in their report dated June 2011; 9. Ground and surface water report prepared by Hannah-Reed revised May 2011 (in particular the recommendations in paragraph 9) and the later Hannah Reed report dated September 2011 (in particular the mitigation measures in para. 7); 10. Supporting Statement - Application for approval of details for the extraction of sand and gravel Partridge Hill, High Common Lane, Austerfield on behalf of Misson Sand and Gravel Co. Ltd.'; 11. Document entitled 'Birdstrike and the Airport' (undated) prepared by John M. Hunt and submitted to Doncaster MBCon 12th October 2011; 12. Plan References: i) JMH/RO/AV/4 - Feb 2011 ii) JMH/RO/AV/5 - Feb 2011 iii) JMH/RO/AV/1b - Feb 2011 iv) JMH/RO/AV/2a - Nov 2010 v) JMH/RO/AV/3 - Feb 2011 vi) JMH/RO/AV/2b - Nov 2010 vii) JMH/RO/AV/1a - Feb 2011 viii) 'Secure Site Accommodation' extract - undated."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008736,"name":"Limit on material to be deposited","dataset":"planning-condition","typology":"policy","reference":"U0118843","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the groundwater quality in the area.","description":"No material, except for a maximum of 30,000 tonnes per annum of clean topsoil (meeting British Standard BS3882 specification), sand and gravel for blending with sand won from the site, shall be deposited on the site. No waste or other soil making materials shall be imported and deposited within the site."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008737,"name":"Record of vehicles entering site","dataset":"planning-condition","typology":"policy","reference":"U0118844","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To assist in the monitoring and compliance with the above condition.","description":"The operator shall maintain records of all vehicles entering the site in relation to the importation of soil. This will include a record of the total tonnage imported per calendar year. These records shall be made available for inspection by the Mineral Planning Authority within two working days of a verbal or written request."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008738,"name":"Impervious bases/walls","dataset":"planning-condition","typology":"policy","reference":"U0118845","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To prevent pollution to the water environment and in the interests of local amenity.","description":"Any oil, fuel or chemical storage tank or container, shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound shall be at least equivalent to the capacity of the tank or container plus 10 %. If there is multiple tankage, the volume of the bunded compound shall be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipe work shall be located above ground and protected from accidental damage. All filling points and tank overflow outlets shall be constructed to discharge vertically downwards within the bunded compound."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008739,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0118846","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the groundwater quality of the area.","description":"There shall be no discharge of foul or contaminated drainage from the site into either the groundwater or any surface waters, whether direct or via soakaways."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008740,"name":"Restoration scheme","dataset":"planning-condition","typology":"policy","reference":"U0118847","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is adequately restored should mineral operations cease.","description":"Should operations permanently cease at any time following the recommencement of the winning and working of minerals before the full term of this permission, an alternative restoration scheme shall be submitted and approved by the Mineral Planning Authority, and implemented within 6 months of receiving such approval."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008741,"name":"Open water","dataset":"planning-condition","typology":"policy","reference":"U0118848","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of birdstrike at the nearby airport.","description":"No areas of open water shall be created as part of the mineral extraction operations, including the reclamation of the site, unless otherwise approved in writing by the Mineral Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008742,"name":"Baffle/screen mound","dataset":"planning-condition","typology":"policy","reference":"U0118849","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of residential amenity.","description":"The baffle/screen mound shown on plan JMH/RO/AV/2a and JMH/RO/AV/2b is to be maintained throughout the life of the development until required for the final stages of reclamation."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008743,"name":"Landscaping scheme","dataset":"planning-condition","typology":"policy","reference":"U0118850","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is adequately landscaped.","description":"The approved landscaping scheme (based on the Bird Management Plan and Restoration Guidance document dated 9th December 2011) detailing species, mix, siting, size, method of planting, planting distances and programme of planting together with details of existing trees and shrubs to be retained shall be submitted to, and approved in writing by, the Mineral Planning Authority. The proposed landscaping shall not increase the potential for increasing the risk of birdstike to the airport operations and advice given in CAP 772 Birdstrike Risk Management for Aerodromes (para. 4.4) and section 3.2 of the FERA Bird Management Plan and Restoration Guidance shall be adopted. Any tree or shrub severely damaged or is found to be dying or seriously diseased within five years of the completion of any phase of the landscaping scheme shall be replaced within the next available planting season with a tree or shrub of a similar size and species."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3380&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3360&limit=10"},"count":5605}