{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008704,"name":"Flood proofing","dataset":"planning-condition","typology":"policy","reference":"U0118166","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the development is flood resilient.","description":"All flood proofing and resilience measures as detailed in Section 7 of the approved Flood Risk Assessment (GeoSmart, ref. 78417R1, dated 2023-01-13) shall be implemented prior to the occupation of the development and retained for the lifetime of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008705,"name":"Floor levels","dataset":"planning-condition","typology":"policy","reference":"U0118167","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that any new development complies with Environment Agency standing advice","description":"Floor levels within the proposed development will be set no lower than 0.3m above the maximum flood level of 15.6m AOD"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008706,"name":"plans","dataset":"planning-condition","typology":"policy","reference":"U0118454","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: * Proposed plans 123.01.rev06 dated 16.7.23 received 2.8.23 * Streetscene 123. 05. received 9.1.24 * Flood Risk Assessment dated 9.10.23 amended and received 5.12.23 * Remediation Strategy C487/RS dated August 23 received 31.8.23 * Flood Warning and Evacuation Plan received 13.7.23 * Phase 1 preliminary assessment received 2.5.23 C487 * Phase 2 assessment received 13.3.23 C487/1 * Gas monitoring received 5.7.23"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008707,"name":"EA","dataset":"planning-condition","typology":"policy","reference":"U0118455","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants, To ensure the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment, Consider how people will be kept safe from the identified flood hazards, Provide an adequate finished floor level for the development. The Environment Agency highlight that there were significant errors in original FRA (03/04/2022) and, following our reported concerns to the local planning authority, R.P.M. Draughting Ltd. submitted a revised assessment that includes the above details.","description":"The development shall be carried out in accordance with the revised flood risk assessment (09/10/2023), that was submitted by R.P.M. Draughting Limited, and including the following mitigation measures that it details in section 5: o Finished ground floor levels shall be set no lower than 4.4 metres above Ordnance Datum (AOD), o There shall be no sleeping accommodation located on the ground floor of the development, o Flood resilience measures will be incorporated, with the ground floor being tiled or water compatible coverings as stated in section 5.0 of the Flood Risk Assessment (FRA), o All electrical sockets will be located 450mm above the finished floor level as stated in section 5.3 of the FRA, o Services pipes or ducts that penetrate the building to be located above finished floor levels. These mitigation measures shall be fully implemented prior to and during occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008708,"name":"pollution","dataset":"planning-condition","typology":"policy","reference":"U0118456","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008709,"name":"HIGH11","dataset":"planning-condition","typology":"policy","reference":"U0118457","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To avoid damage to the verge.","description":"The development hereby approved shall not be brought into use until a crossing over the footpath/verge has been constructed in accordance with a scheme previously approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008710,"name":"drainage","dataset":"planning-condition","typology":"policy","reference":"U0118458","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The development hereby granted shall not begin any drainage works until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008711,"name":"boundary","dataset":"planning-condition","typology":"policy","reference":"U0118459","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The local planning authority considers that further development could cause detriment to the character of the area and for this reason would wish to control any future development to comply with policy 10 of the Doncaster Local Plan.","description":"Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 2 (or any subsequent order or statutory provision revoking or re-enacting that order) no walls, fences or other means of enclosure shall be erected on land between the walls of any dwellings fronting a highway and the highway boundary without the prior permission of the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008712,"name":"materials","dataset":"planning-condition","typology":"policy","reference":"U0118460","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the materials are appropriate to the area in accordance with policy 42 of the Doncaster Local Plan.","description":"Prior to the commencement of the relevant works, details of the proposed external materials and windows/doors shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008713,"name":"balcony","dataset":"planning-condition","typology":"policy","reference":"U0118461","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect neighbouring amenity","description":"Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 2 (or any subsequent order or statutory provision revoking or re-enacting that order) the roof of the rear single storey extension shall not be used as a platform or balcony for the lifetime of the development."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3350&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3330&limit=10"},"count":5605}