{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008694,"name":"Separate foul/surface water drainage(YW)","dataset":"planning-condition","typology":"policy","reference":"U0118156","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of satisfactory and sustainable drainage","description":"The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be submitted to and agreed by the Local Planning Authority prior to the commencement of development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008695,"name":"CTMP","dataset":"planning-condition","typology":"policy","reference":"U0118157","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety","description":"No development shall take place, including any works of demolition, until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: - Construction Start date and duration - Temporary Signage on the highway - Site Compound location and Layout - Parking of vehicles of site operatives and visitors - Loading and unloading of plant and materials - Storage of plant and materials used in constructing the development - Measures to control noise and the emission of dust and dirt during construction - Wheel washing facilities - A scheme for recycling/disposing of waste resulting from demolition and construction works"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008696,"name":"Construction Methodology near railway","dataset":"planning-condition","typology":"policy","reference":"U0118158","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that development can be undertaken safely and without impact to operational railway safety.","description":"Development shall not commence until a construction methodology has been submitted to and approved in writing by the Local Authority. The construction methodology shall demonstrate consultation with the Asset Protection Project Manager at Network Rail. The development shall thereafter be carried out in accordance with the approved construction methodology unless otherwise agreed in writing by the Local Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008697,"name":"Tree Works to be agreed","dataset":"planning-condition","typology":"policy","reference":"U0118159","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that all tree work is carried out to the appropriate high standard.","description":"The development hereby granted shall not be commenced until a schedule of tree surgery work has been submitted to and approved in writing by the Local Planning Authority. Best arboricultural practice shall be employed in all work, which shall comply with British Standards BS3998:2010 Tree Works Recommendations and, unless as may be specifically approved in writing by the Local Planning Authority, all tree work shall be completed before the demolition or development commences."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008698,"name":"Lighting","dataset":"planning-condition","typology":"policy","reference":"U0118160","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of the safety, operational needs and integrity of the railway.","description":"Prior to the commencement of relevant works, details of any external lighting shall be submitted to the Local Planning Authority to be approved in conjunction with Network Rail."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008699,"name":"Trespass fence","dataset":"planning-condition","typology":"policy","reference":"U0118161","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To prevent trespass onto the railway from the development site and in the interests of the safety, operational needs and integrity of the railway.","description":"Prior to first occupation of the development hereby approved, the developer must install a suitable trespass proof fence adjacent to Network Rail's boundary (approx. 1.8m high) and make provision for its future renewal and maintenance. Network Rail's existing fencing/wall must not be removed or damaged."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008700,"name":"EV charging points","dataset":"planning-condition","typology":"policy","reference":"U0118162","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To contribute towards a reduction in emissions in accordance with air quality objectives and providing sustainable travel choice in accordance with policy 13 of the Doncaster Local Plan.","description":"Prior to the occupation of the development hereby approved, details of electric vehicle charging provision shall be submitted to and approved in writing by the local planning authority. Installation shall comply with current guidance/advice. The development shall not be occupied until the approved connection has been installed and is operational and shall be retained for the lifetime of the development. The development shall be carried out in accordance with the approved details."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008701,"name":"Cycle parking","dataset":"planning-condition","typology":"policy","reference":"U0118163","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that satisfactory facilities for the parking of cycles are provided and to encourage travel by means other than private motor vehicles and to comply with policy 13 of the Doncaster Local Plan.","description":"Prior to first occupation, details for the provision of a minimum of 2 visitor/staff cycle parking spaces shall be submitted to and approved by the Local Planning Authority. The cycle parking agreed shall be implemented and retained for the lifetime of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008702,"name":"Soft landscaping","dataset":"planning-condition","typology":"policy","reference":"U0118164","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of ecological enhancement and to improve the visual appearance of the site","description":"Prior to first occupation of the development hereby approved, details of a soft landscaping scheme shall be submitted to and approved the Local Planning Authority. The approved scheme shall be implemented prior to first occupation and retained for the lifetime of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008703,"name":"Piped SW discharge","dataset":"planning-condition","typology":"policy","reference":"U0118165","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network","description":"No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3340&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3320&limit=10"},"count":5605}