{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008684,"name":"Materials","dataset":"planning-condition","typology":"policy","reference":"U0117701","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the materials are appropriate to the area in accordance with policy 42 of the Doncaster Local Plan.","description":"Prior to any above ground works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008685,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0117702","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The development hereby granted shall not be begun until details of the foul and surface water systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008686,"name":"Construction Management","dataset":"planning-condition","typology":"policy","reference":"U0117703","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety","description":"No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for the following as a minimum and expanded as required: i. the parking of vehicles for site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v. wheel washing facilities vi. measures to control noise and the emission of dust and dirt during construction vii. a scheme for recycling/disposing of waste resulting from demolition and construction works"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008687,"name":"Construction Impact Management","dataset":"planning-condition","typology":"policy","reference":"U0117704","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents.","description":"Before any construction works are started on the application site, a Construction Impact Management Plan, indicating measures to be taken to mitigate the effects of the construction activity and associated vehicle movements upon the living conditions of neighbouring residents and highway safety shall be submitted to and approved by the Local Planning Authority. The mitigation measures shall include provision for the following: the limitation of noise, the means of enclosure of the construction sites, and any proposed external security lighting installation; the control of dust emissions; the control of deposition of mud or debris on the highway, and the routing of contractors' vehicles. The mitigation measures so approved shall be carried out at all times during the construction of the development hereby approved."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008688,"name":"Ecology","dataset":"planning-condition","typology":"policy","reference":"U0117705","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the enhancement the Borough's ecological networks ecological in accordance with Local Plan policy 29","description":"Within one month of commencement of development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: - The installation of 2x No. built-in Ibstock bat bricks (or similar) with locations and orientations as specified by a suitably qualified ecologist. - The installation of 1x swift box with location and orientation as specified by a suitably qualified ecologist."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008689,"name":"Cycle Storage","dataset":"planning-condition","typology":"policy","reference":"U0117706","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that satisfactory facilities for the parking of cycles are provided and to encourage travel by means other than private motor vehicles and to comply with policy 13 of the Doncaster Local Plan.","description":"The development hereby permitted shall not be commenced until details of secure cycle parking facilities for the occupants of, and/or visitors to the development have been submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the occupation of the development hereby permitted and shall thereafter be retained for use at all times."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008690,"name":"High 1","dataset":"planning-condition","typology":"policy","reference":"U0117707","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate provision for the disposal of surface water and ensure that the use of the land will not give rise to mud hazards at entrance/exit points in the interests of public safety.","description":"Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008691,"name":"High 2","dataset":"planning-condition","typology":"policy","reference":"U0117708","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To avoid the necessity of vehicles reversing on to or from the highway and creating a highway hazard.","description":"The vehicle turning space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008692,"name":"High 3","dataset":"planning-condition","typology":"policy","reference":"U0117709","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that adequate parking provision is retained on site.","description":"Before the development hereby permitted is brought into use, the parking as shown on the approved plans shall be provided. The parking area shall not be used otherwise than for the parking of private motor vehicles belonging to the occupants of and visitors to the development hereby approved."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008693,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0118155","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan - Proposed GF Layout and Site Plan (RDS220525, Revision 5) - Proposed Elevations (RDS220525, Revision 3) - Topographical Survey, drawing no. 001 - Flood Risk Assessment (GeoSmart, ref. 78417R1, dated 2023-01-13) - Flood Evacuation Plan (ref. 78417.01R1)"}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3330&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3310&limit=10"},"count":5605}