{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008644,"name":"Foul drainage to cesspool details needed","dataset":"planning-condition","typology":"policy","reference":"DJ10","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"To ensure that details of the required cesspool are approved by the Local Planning Authority prior to the commencement of any works on the site.","description":"Foul drainage from the site shall be discharged to a cesspool, details of which shall be submitted to and approved by the Local Planning Authority prior to the commencement of any works on the site."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008645,"name":"Ecological management plan","dataset":"planning-condition","typology":"policy","reference":"ECOL2A","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with policy 30 of the Doncaster Local Plan.","description":"Prior to the commencement of development, an ecological management plan shall be submitted to the Local Planning Authority for approval in writing. This plan shall include details of how all the retained and created habitats on the site will be managed. The habitats shall thereafter be managed in accordance with the ecological management plan."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008646,"name":"Construction Method Statement","dataset":"planning-condition","typology":"policy","reference":"ENVH4","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety.","description":"No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) - the parking of vehicles of site operatives and visitors ii) - loading and unloading of plant and materials iii) - storage of plant and materials used in constructing the development iv) - the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) - wheel washing facilities vi) - measures to control noise and the emission of dust and dirt during construction vii) - a scheme for recycling/disposing of waste resulting from demolition and construction works"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008647,"name":"Satisfactory refuse and recycling storag","dataset":"planning-condition","typology":"policy","reference":"RES6","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"To ensure the satisfactory provision of facilities for the storage of refuse.","description":"No development shall take place until a scheme for the storage of refuse and recycling has been submitted to and approved in writing by the local planning authority. The scheme shall be carried out in full as approved prior to first occupation of the development and the refuse and recycling storage facilities shall thereafter be retained for use at all times."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008648,"name":"Submission of Reserved Matters","dataset":"planning-condition","typology":"policy","reference":"STAT3","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"Condition required to be imposed by Section 92(as amended) of the Town and Country Planning Act 1990.","description":"In the case of the reserved matters, application for approval must be made not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008649,"name":"Design and Assoc Management SuDs","dataset":"planning-condition","typology":"policy","reference":"SUDS1","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"To prevent the increased risk of flooding; to ensure the future maintenance of the SuDS system, to improve water quality, habitat and amenity all in accordance with NPPF.","description":"No development shall take place until a detailed design and associated management and maintenance plan of surface water drainage for the site, based upon sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development has been submitted in accordance with the approved detailed design, prior to the use of the development commencing. The scheme to be submitted shall demonstrate that the surface water drainage system(s) are designed in accordance with the South Yorkshire Interim Local Guidance for SuDS."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008650,"name":"Implementation","dataset":"planning-condition","typology":"policy","reference":"U0116888","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008651,"name":"Approved Plans","dataset":"planning-condition","typology":"policy","reference":"U0116889","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Site Layout (119/16/1) - Location Plan (HAR/WOOD/CARAV/10/1)"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008652,"name":"Drainage DA01","dataset":"planning-condition","typology":"policy","reference":"U0116890","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the first use of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008653,"name":"Highways HIGH3","dataset":"planning-condition","typology":"policy","reference":"U0116891","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that adequate parking provision is retained on site.","description":"Before the development hereby permitted is brought into use, the parking as shown on the approved plans shall be provided. The parking area shall not be used otherwise than for the parking of private motor vehicles belonging to the occupants of and visitors to the development hereby approved."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3290&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3270&limit=10"},"count":5605}