{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003240,"name":"Landscaping implementation/maintenance","dataset":"planning-condition","typology":"policy","reference":"U0130633","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the proper maintenance of the landscaped areas and the green wall, in the interests of visual amenity, biodiversity, and compliance with City of Doncaster Policy 48, and to ensure the long-term success of the landscaping scheme.","description":"1. Submission of Maintenance Plan: Prior to the commencement of development, a detailed 5-year landscape maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. This plan shall cover all landscaped areas, including the green wall, and shall include the following details: - Maintenance Schedule: A schedule of maintenance tasks to be carried out, including frequency and timing. - Responsible Parties: Identification of the parties responsible for carrying out the maintenance tasks. - Watering Regime: Details of the watering regime for all landscaped areas, including the green wall. - Fertilisation and Soil Management: Information on fertilisation practices and soil management to ensure the health and vitality of the plants. - Pruning and Trimming: Guidelines for the pruning and trimming of plants to maintain their shape and health. - Pest and Disease Control: Measures for the control of pests and diseases. - Replacement Planting: Procedures for the replacement of any plants that fail to establish or die within the 5-year period. 2. Implementation of Maintenance Plan: The approved landscape maintenance plan shall be implemented in full for a period of 5 years from the date of planting. Any plants, including those in the green wall, which die, are removed, or become seriously damaged or diseased within this period shall be replaced in the next planting season with others of similar size and species, unless otherwise agreed in writing by the Local Planning Authority. 3. Compliance with Policy 48: The landscape maintenance plan shall comply with the requirements of City of Doncaster Policy 48, which emphasises the importance of sustainable landscaping practices, biodiversity enhancement, and the use of native species where possible. The plan should also include measures to ensure the long-term sustainability and ecological value of the landscaped areas. 4. Monitoring and Reporting: An annual report detailing the maintenance activities carried out, the condition of the landscaped areas, and any replacement planting undertaken shall be submitted to the Local Planning Authority for review."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003241,"name":"Adaptability plots","dataset":"planning-condition","typology":"policy","reference":"U0130634","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure compliance with the requirements of Local Plan Policy 45 to deliver the agreed accessible and adaptable homes.","description":"Prior to first occupation of the each of the dwellings listed below, Building Control Completion Certificates must have been provided to the Local Planning Authority demonstrating that the specified optional requirements as set out in the Building Regulations 2010 (as amended) have been achieved for the following plots: Apartments 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14 must meet Part M4(2) 'accessible and adaptable dwellings. Apartment 1 must meet Part M4(3) 'wheelchair adaptable dwellings."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003242,"name":"Street trees","dataset":"planning-condition","typology":"policy","reference":"U0130635","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure appropriate design of trees within the adoptable public highway and avoid any potential design conflicts with utilities to meet Local Plan Policy 48.","description":"Prior to the commencement of development and the signing of any S38 agreement, details of the proposed tree pits and utilities siting and alignments within the adoptable highway shall be submitted to and agreed in writing by the Local Planning Authority. This shall include a detailed specification for tree pit construction that utilises either grass verges or a professionally recognised crate system construction to provide the minimum rooting volume set out in the Council's Transitional Developer Guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation; a timescale of implementation, and where required a maintenance specification until trees are adopted by the Council. To minimise future conflict with utilities in new developments, where trees are proposed within the footway or highway build outs, the creation of a common utility enclosure with the necessary provisions for safely including both mains' services and ducting should be considered in the utility design. This is preferably located adjacent to the property front boundary, under the footway, to facilitate service connections. The developer is to consider the requirements of National Joint Utilities Group guidance volume 4 regarding the installation of trees and the required installation and maintenance of statutory undertakers' apparatus. http://streetworks.org.uk/wp-content/uploads/V4-Trees-Issue-2-16-11-2007.pdf Thereafter, the landscape scheme and utility design shall be implemented in full accordance with the approved details, with the crating system laid prior to any utilities. The Local Planning Authority shall be notified prior to the backfilling of any engineered tree pits to inspect and confirm compliance and within seven days of the completion of landscape works to inspect and approve practical completion in writing."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003243,"name":"EHO - Accoustic Report","dataset":"planning-condition","typology":"policy","reference":"U0130636","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the amenity of future occupiers.","description":"Prior to first occupation of the apartments hereby approved, the applicant shall submit a report demonstrating the acoustic assessment and specified design criteria required to achieve the following standards, for approval by the local planning authority. All requirements contained within the approved report shall be implemented and a commissioning report demonstrating actual compliance submitted, prior to first occupation of any apartment. A maximum noise level in the following locations of: Living rooms - 35 dB LAeq, 16hr (07.00 - 23.00hrs) due to representative external ambient noise; Bedrooms (daytime resting) - 35 dB LAeq, 16hr (07.00-23.00hrs) due to representative external ambient noise; Bedrooms - 30 dB LAeq, 8hr (23.00 - 07.00hrs) and individual noise events not normally exceeding 45dB max (F time weighting) due to representative external ambient noise; If the noise standards are to be met with windows closed, appropriate acoustically attenuated alternative ventilation shall be specified and provided. Following completion of all works in the approved report, the applicant shall undertake post-completion testing and submit a further report to demonstrate compliance with the required standards, or undertake further remedial action to achieve compliance if this is not met in any relevant room."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003244,"name":"EHO-Bin Stores","dataset":"planning-condition","typology":"policy","reference":"U0130637","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that satisfactory facilities for the storage and collection of waste is agreed as required by Policy 44.B.10 of the Local Plan.","description":"The development hereby permitted shall not be commenced until details of bin stores for the occupants of the development have been submitted to and approved in writing by the local planning authority. The provision of bin stores for the site shall be fully implemented and made available for use prior to the occupation of the development hereby permitted."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003245,"name":"Waste Management Plan","dataset":"planning-condition","typology":"policy","reference":"U0130638","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of the amenity of the locality.","description":"Prior to first occupation, the developer shall submit for approval to the local planning authority in writing, a scheme for the management and storage of waste. All such requirements of the approved scheme shall be implemented prior to occupation and subsequently complied with. The applicant shall have regard to City of Doncaster Council's Technical & Developer Requirements Supplementary Planning Document section 18 for best practice when designing the development's waste management scheme. https://dmbcwebstolive01.blob.core.windows.net/media/Default/Planning/Documents/LDF/SPDs/Technical%20and%20Developer%20Requirements%20SPD%20-%20Adopted%20August%202023.pdf"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003246,"name":"5-year BNG management on site","dataset":"planning-condition","typology":"policy","reference":"U0130639","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the habitat creation on site and subsequent management measures are sufficient to deliver a net gain in biodiversity as required by Local Plan policy 30B and the NPPF paragraph 174d","description":"On the commencement of development, a Management and Monitoring Plan for proposed onsite habitats based on the proposals set out in the biodiversity net gain report shall be submitted to the Local Planning Authority for approval in writing. The Management and Monitoring plan shall detail the following: o Objectives relating to the timescales in which it is expected progress towards meeting target habitat conditions will be achieved. o A commitment to adaptive management that allows a review of the management plan to be undertaken and changes implemented if agreed in writing by the LPA and if monitoring shows that progress towards target conditions is not progressing as set out in the agreed objectives. o That monitoring reports shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, and 5) immediately following habitat creation. Once approved in writing the management measures and monitoring plans shall be carried out as agreed."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003247,"name":"Details of Ext lighting","dataset":"planning-condition","typology":"policy","reference":"U0130640","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of amenity for adjacent neighbours.","description":"Prior to commencement of development details of any external lighting shall be submitted to the Local Planning Authority for approval."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003248,"name":"Drainage Matintenance","dataset":"planning-condition","typology":"policy","reference":"U0130641","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with Para. 169 c) of the NPPF (2021).","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003249,"name":"Implementation","dataset":"planning-condition","typology":"policy","reference":"U0130768","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3250&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3230&limit=10"},"count":5605}