{"entities":[{"entry-date":"2025-02-25","start-date":"","end-date":"","entity":73003230,"name":"Permitted Works","dataset":"planning-condition","typology":"policy","reference":"U0130445","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To define the extent of the work permitted ensuring potentially harmful effects of the pruning are minimised.","description":"Work shall be limited to: Pruning selected branches on the dwelling side of the tree by no more than 2 metres to proper pruning points."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003231,"name":"Works to British Standards","dataset":"planning-condition","typology":"policy","reference":"U0130446","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the work is carried out in a correct manner to protect the health of the trees and its contribution to the visual amenity and character of the local landscape.","description":"All work must be carried out to British Standard 3998:2010 Tree Work - Recommendations."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003232,"name":"2 Year Expiration","dataset":"planning-condition","typology":"policy","reference":"U0130447","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure approved works are carried out in an appropriately timed and proper manner.","description":"This consent is valid for a period of 2 years beginning with the date of this consent and all works can only be carried out once."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003233,"name":"Replacement Planting","dataset":"planning-condition","typology":"policy","reference":"U0130448","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure replacement planting is undertaken in the interests of the continued amenity and contribution to the character of the local landscape.","description":"Within 12 months of 3 Hawthorn and 3 Willow trees being felled, a 3 Crataegus and 3 Acer campestre (3 Hawthorn and 3 Field Maple) (or other species to be agreed in writing beforehand with the local planning authority) must be planted. This must be in the same or similar location as the felled trees. When planted the circumference of the trunk of the new trees measured at 150 centimetres above ground level must be 12-14 centimetres."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003234,"name":"Tree Protection","dataset":"planning-condition","typology":"policy","reference":"U0130449","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To help the trees become established and to ensure any failure is replaced.","description":"When planted the trees must be adequately staked, tied, protected and maintained for a period of two years. During that period all losses must be made good."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003235,"name":"Permitted Works","dataset":"planning-condition","typology":"policy","reference":"U0130450","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To define the extent of the work permitted ensuring potentially harmful effects of the pruning are minimised.","description":"Work on trees adjacent to the footpaths shall be limited to: Increasing the clearance above ground level by no more than 3 metres"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003236,"name":"Approved Plans list","dataset":"planning-condition","typology":"policy","reference":"U0130629","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan Dwg 200212 01 Rev A Recd 21.11.2023 AMENDED Site Layout Dwg 200212 02 Rev K Recd 19.11.2024 AMENDED Ground and First floors Dwg 200212 03 Rev E Recd 06.09.2024 AMENDED Proposed 2nd/3rd/4th Floors Dwg 200212 04 Rev E Recd 06.09.2024 AMENDED Front and Rear Dwg 200212 05 Rev B Recd 16.08.2024 AMENDED Sides Dwg 200212 06 Rev B Recd 16.08.2024 Outlook and Daylighting Study Dwg 200212 08 Rev A Recd 17.09.2024 Site Section and Street Scenes Dwg 200212 09 Rev A Recd 16.08.2024"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003237,"name":"Hways CTMP","dataset":"planning-condition","typology":"policy","reference":"U0130630","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety","description":"No development shall take place, including any works of demolition, until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period and shall provide for the following and answered in the order they are written below, for ease of checking, with additional information appended at the end: i. The site compound and parking of vehicles for site operatives and visitors ii. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) iii. Contract duration iv. The areas for loading and unloading of plant and materials v. Storage of plant and materials used in constructing the development vi. The location, erection and maintenance of any security hoarding to be installed vii. Wheel washing facilities (location and type) viii. Measures to control noise and the emission of dust and dirt during construction ix. Temporary signage on the adopted highway"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003238,"name":"Ext Materials","dataset":"planning-condition","typology":"policy","reference":"U0130631","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the satisfactory appearance of the development.","description":"Before the development commences, product details of the proposed external materials shall be submitted to and approved in writing by the Local Planning Authority. This may include submission of samples if requested by the Local Planning Authority. The development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003239,"name":"Hard & Soft Landscape Scheme","dataset":"planning-condition","typology":"policy","reference":"U0130632","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of environmental quality and Local Plan policy 48.","description":"No development shall take place on the site until a detailed hard and soft landscape scheme based on the approved Site Plan (drawing 200212/02/J ) has been submitted to and approved in writing by the Local Planning Authority. The hard landscape scheme shall include details of all external hard surfacing materials, including adoptable highway finishes and footpaths through POS. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a detailed specification for tree pit construction for the trees within highway that utilises a professionally recognised method of construction to provide the minimum rooting volume set out in the Council's guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation and details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping for any individual housing plot must be implemented in full accordance with the approved scheme, prior to occupation of the home, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme unless the local planning authority gives its written approval to any variation."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3240&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3220&limit=10"},"count":5605}