{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003090,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0126198","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 2023/012/50 - Site Plan, drawing no. 2022/132/01A - Proposed Plans, drawing no. 2022/132/03, amended version received 27th August 2024"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003091,"name":"Occupation ancillary to residential use","dataset":"planning-condition","typology":"policy","reference":"U0126199","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of residential amenity","description":"The facility on the approved layout (room and WC accessed externally from the front of the building) shall be used for purposes ancillary to the main residential use of the site only."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003092,"name":"Ecology","dataset":"planning-condition","typology":"policy","reference":"U0126221","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29","description":"Prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority an ecological enhancement plan shall be implemented under the supervision of a suitably qualified ecologist . This plan shall include details of the following measures. Photographic evidence of implementation shall be submitted to the local planning authority o Two integrated bat boxes of the Vivaro Pro, build-in. bat Tube (or similar) be installed within the proposed development. o One swift box of the Vivaro Madrid Swift Nest Box (or similar) be attached to the proposed development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003093,"name":"Use restriction","dataset":"planning-condition","typology":"policy","reference":"U0126222","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The site lies in an area where planning permission for a new dwelling would not normally be granted.","description":"The occupation of the dwelling hereby approved shall be limited to a person solely or mainly employed, or last employed, in the locality in agriculture as defined in Section 336 of the Town and Country Planning Act 1990, or a widow or widower of such a person, and to any dependants."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003094,"name":"Time Limit","dataset":"planning-condition","typology":"policy","reference":"U0126620","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003095,"name":"Approved Documents","dataset":"planning-condition","typology":"policy","reference":"U0126621","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: - Site Plan (DWG no023/075/PDP1/D) dated August 2024; - Plans & Elevations Plot 1 (DWG no023/073/PDP1) dated October 2023; - Plans Plot 2 (DWG no023/074/PPP2) dated October 2023; - Elevations Plot no2 (DWG no023/074/PDP1) dated October 2023; - Biodiversity Net Gain Metric (John Davies BSc (hons) - Estrada Ecology Ltd) (date of metric completion 22 January 2024); - Biodiversity Net Gain Report (Ref: SQ2235) dated 22 July 2024."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003096,"name":"BNG Grampian condition","dataset":"planning-condition","typology":"policy","reference":"U0126622","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the delivery of the required biodiversity net gain with a suitable scheme in accordance with Policies 26, 29 and 30 of the Local Plan. The condition is required to be discharged prior to the commencement of development to ensure BNG is delivered.","description":"Prior to the commencement of development the scheme of native tree planting, as specified under para. 10.4 and 10.5 to the approved Biodiversity Net Gain Report, to the area of land edged blue to the approved Site Plan [(DWG no023/075/PDP1/D) dated August 2024] shall be begun during the first available planting season. It shall thereafter be maintained by the site owner for a period of five years. Any tree or shrub planted in accordance with the scheme which becomes damaged or diseased or dies or is removed within the five years shall be replaced during the next planting season. Any staking, tying, weeding, watering and other action deemed necessary by the Local Planning Authority shall be carried out by the owner in accordance with the Authority's publication 'Landscape Specification in Relation to Development Sites'."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003097,"name":"Contamination","dataset":"planning-condition","typology":"policy","reference":"U0126623","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"Prior to the commencement of development a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003098,"name":"Unexpected contamination","dataset":"planning-condition","typology":"policy","reference":"U0126624","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003099,"name":"Importation of soils","dataset":"planning-condition","typology":"policy","reference":"U0126625","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3100&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3080&limit=10"},"count":5605}