{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003070,"name":"Obscure Glazing","dataset":"planning-condition","typology":"policy","reference":"U0125525","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not impact on the privacy of the neighbouring properties.","description":"The first-floor windows on the side elevations of the dwellings shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003071,"name":"Contamination (CON1)","dataset":"planning-condition","typology":"policy","reference":"U0125526","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"No development shall commence until a contaminated land assessment and associated remedial strategy, together with a timetable of works, has been submitted to and approved in writing by the Local Planning Authority (LPA). a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003072,"name":"Contamination (CON2)","dataset":"planning-condition","typology":"policy","reference":"U0125527","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) shall be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been submitted to and approved in writing by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003073,"name":"Contamination (CON3)","dataset":"planning-condition","typology":"policy","reference":"U0125528","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Policies 54 and 55 of the Local Plan.","description":"Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by an appropriate risk assessment) and source material information shall be submitted to and approved in writing by the Local Planning Authority prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003074,"name":"Liquid Storage Tanks","dataset":"planning-condition","typology":"policy","reference":"U0125529","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that there are no discharges to the public sewerage system which may injure the sewer, interfere with free flow or prejudicially affect the treatment and disposal of its contents.","description":"Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003075,"name":"Yorkshire Water CEMP","dataset":"planning-condition","typology":"policy","reference":"U0125530","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development can be properly drained.","description":"No development shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, in order to understand the impact of the planning permission on the principal aquifer. The development shall thereafter be carried out in accordance with the recommendations of the approved CEMP."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003076,"name":"Tree Protection Measures","dataset":"planning-condition","typology":"policy","reference":"U0125531","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that trees are protected from damage during construction.","description":"The development hereby granted shall not be commenced nor materials or machinery brought onto the site until the trees which it has been agreed shall be retained are fenced off in accordance with a scheme that has been submitted to and approved in writing by the Local Planning Authority. The works shall thereafter be carried out in accordance with the approved scheme."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003077,"name":"Soft Landscaping","dataset":"planning-condition","typology":"policy","reference":"U0125532","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that a suitable soft landscaping scheme is provided.","description":"Prior to the commencement of above ground works, details of a landscaping/planting scheme shall be submitted to and agreed in writing by the Local Planning Authority. This scheme shall indicate all existing trees and hedgerows on the site, showing their respective size, species and condition. It shall distinguish between those which are to be retained, those proposed for removal and those requiring surgery. The scheme should also indicate, where appropriate, full details of new or replacement planting. Planting shall take place in the first suitable planting season, following the commencement of the development. Any tree or shrub planted in accordance with the scheme and becoming damaged, diseased, dying or removed within five years of planting shall be replaced in accordance with the above document."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003078,"name":"Ecological Enhancement Measures","dataset":"planning-condition","typology":"policy","reference":"U0125533","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the development contributes to ecological networks in accordance with Policy 29 of the Local Plan.","description":"Prior to the occupation of the dwellings, the ecological measures outlined within Site Plan Ecology (SM-004 Rev E) shall be implemented in full."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003079,"name":"Access and Parking Area","dataset":"planning-condition","typology":"policy","reference":"U0125534","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure highway safety is protected in accordance with Policy 13 (A) of the Local Plan.","description":"Prior to the occupation of the dwelling, details of the surfacing of the part of the site which shall be used by vehicles shall be submitted to and approved in writing by te Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details and the driveway and parking area shall be provided prior to the occupation of the dwellings."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3080&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3060&limit=10"},"count":5605}