{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003010,"name":"Removed","dataset":"planning-condition","typology":"policy","reference":"U0124941","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","description":"Removed."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003011,"name":"CMS","dataset":"planning-condition","typology":"policy","reference":"U0124942","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk and protect highway safety in accordance with Policy 13 of the Local Plan.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the Construction Method Statement and the details shown on the approved plans and specifications."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003012,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0124943","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that surface water is discharged to soakaway where possible in accordance with Policy 56 of the Local Plan.","description":"A surface water sustainable system (SuDS) shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to bringing the building into use."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003013,"name":"Materials - temple","dataset":"planning-condition","typology":"policy","reference":"U0124944","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the materials are appropriate to the area in accordance with Policy 46 of the Local Plan.","description":"Prior to the commencement of the relevant works, details of the proposed external materials for the temple shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003014,"name":"Workshop temporary uses - removed","dataset":"planning-condition","typology":"policy","reference":"U0124945","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","description":"Removed."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003015,"name":"Expiration of three years","dataset":"planning-condition","typology":"policy","reference":"U0125097","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003016,"name":"plans","dataset":"planning-condition","typology":"policy","reference":"U0125098","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed in accordance with the terms of this permission and the details shown on the approved plans listed below: 23/121 drg. no. 002C (for the rear property) 23/121 drg. no, 003 (in relation to the frontage property element only) 23/121 drg. no. 004A 23/121 drg. no. 007A"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003017,"name":"Site to be used by vehicles","dataset":"planning-condition","typology":"policy","reference":"U0125099","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate provision for the disposal of surface water and ensure that the use of the land will not give rise to mud hazards at entrance/exit points in the interests of public safety.","description":"Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003018,"name":"Unexpected significant contamination","dataset":"planning-condition","typology":"policy","reference":"U0125100","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003019,"name":"first floor side windows obscure","dataset":"planning-condition","typology":"policy","reference":"U0125101","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not impact on the privacy of the adjoining premises","description":"Before the first occupation of the dwellings hereby permitted, the first floor side elevation windows of both dwellings hereby appoved shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3020&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=3000&limit=10"},"count":5605}