{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002930,"name":"Landscaping","dataset":"planning-condition","typology":"policy","reference":"U0122846","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of environmental quality and Local Plan policy 48.","description":"Within 3 months of the date of this permission, a detailed hard and soft landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a detailed specification for tree pit construction for the trees within highway that utilises a professionally recognised method of construction to provide the minimum rooting volume set out in the Council's guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation and details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002931,"name":"Landscape implementation","dataset":"planning-condition","typology":"policy","reference":"U0122847","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure site landscaping works are undertaken as approved in accordance with Policy 48.","description":"Following the commencement of the development and before 30th September of every year during the implementation period (either phased or in full) and 5 year aftercare period, a 'Landscaping Implementation Report' shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the landscaping has been carried out in full accordance with the approved landscaping details. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next 12 months. It shall cover the following matters in particular, but not limited to, species, size, location, planting and aftercare specification, and be illustrated with evidence such as an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, before and after photos of any remedial plantings or completed works. If required, the developer shall arrange to attend a site meeting with the Local Planning Authority to inspect the planting and ongoing maintenance requirements."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002932,"name":"CMP","dataset":"planning-condition","typology":"policy","reference":"U0122848","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents, contamination of the principal aquifer and in the interests of highway safety.","description":"No development shall take place until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: - Details of the methods to be used to control dust, noise, vibration, lighting, potential water pollution and other emissions from the site; - The location of all temporary buildings and compound areas and arrangements for their removal following completion of construction; - Details of areas to be used for the storage of plant and construction materials and waste; - Details of temporary lighting arrangements; - The parking of vehicles of site operatives and visitors; - Hours of construction work; - Measures to ensure that construction vehicles do not deposit mud or debris on the public highway; - A scheme for the routing of construction vehicles accessing the site; - Details of the construction earthworks methodology; and - Meaures to ensure that there is no pollution to the underlying principal aquifer The development shall be carried out in accordance with the approved construction method statement subject to any variations approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002933,"name":"Liquid Storage Tanks","dataset":"planning-condition","typology":"policy","reference":"U0122849","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that there are no discharges to the public sewerage system which may injure the sewer, interfere with free flow or prejudicially affect the treatment and disposal of its contents","description":"Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002934,"name":"No piped discharge","dataset":"planning-condition","typology":"policy","reference":"U0122850","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network","description":"No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002935,"name":"Approved details","dataset":"planning-condition","typology":"policy","reference":"U0122851","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Plot R1 General Arrangement Plot R1 Cross Sections Plot R1 Isopachyte UE-BR-REDLINE-PL-02 Rev A Illustrative Sections Surface Water Management Plan ref UTY-AEC-UE-XX-TN-CE-502 Revision 02 Ecological Appraisal dated December 2023 Biodiversity Net Gain Strategy Dated December 2023"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002936,"name":"Amended plans","dataset":"planning-condition","typology":"policy","reference":"U0123326","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the amended plans listed below: Drawing: General Layout/Floor Plans/Elevations AS PROPOSED. Date: Jan 2024. Drawing No: BDS-2024-001-01. Revision: A. Received by City of Doncaster Council on the 03.04.2024. Drawing: Site/Block Plan Proposed (Scale 1:500). Date: Jan 2024. Drawing No: BDS-2024-001-02. Revision: A. Received by City of Doncaster Council on the 03.04.2024."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002937,"name":"BS STANDARD","dataset":"planning-condition","typology":"policy","reference":"U0123586","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the work is carried out in a correct manner to protect the health of the tree (s) and its contribution to the visual amenity and character of the local landscape.","description":"All work must be carried out to British Standard 3998:2010 Tree Work - Recommendations."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002938,"name":"timescale","dataset":"planning-condition","typology":"policy","reference":"U0123587","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure approved works are carried out in an appropriately timed and proper manner.","description":"This consent is valid for a period of 2 years beginning with the date of this consent and all works can only be carried out once."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002939,"name":"work limitations","dataset":"planning-condition","typology":"policy","reference":"U0123588","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To define the extent of the work permitted ensuring potentially harmful effects of the pruning are minimised.","description":"Work shall be limited to: Reducing the size of the crown to correct pruning points as per the photographs annotated on the application"}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2940&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2920&limit=10"},"count":5605}