{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002910,"name":"Start date","dataset":"planning-condition","typology":"policy","reference":"U0122813","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun not later than 18th April 2026."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002911,"name":"In accordance with plans","dataset":"planning-condition","typology":"policy","reference":"U0122814","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing number D00 dated Aug 23 (Location plan) Drawing number D01 Rev N dated 29.04.24 (Site plan) Drawing number D02 Rev D dated 19.01.24 (Street elevations) Drawing number D14 dated March 24 (Site sections) Drawing number D03 Rev J dated 30.04.24 (Boundary and surface treatment plan) Drawing number D03(1) dated March 24 (Boundary wall typical sections) Drawing number D04 Rev B dated 19.01.24 (Dorton 22B house type) Drawing number D05 Rev C dated 19.01.24 (Elemore 30A house type) Drawing number D06 Rev A dated 19.01.24 (Ellingham 31A house type) Drawing number D07 Rev A dated 19.01.24 (Hazelwood 35A house type) Drawing number D09 Rev A dated 19.01.24 (Dorton 22B juliet balcony house type) Drawing number D10 Rev A dated 19.01.24 (Elemore 30A SO house type) Drawing number D11 Rev G dated 30.04.24 (Materials plan) Drawing number D15 dated 04.03.24 (Tree protection plan) Drawing number D900 Rev G dated 30.04.24 (Planting Strategy) Drawing number 23-030-200 Rev P7 dated 26.03.24 (Engineering layout) Drawing number 23-030-270 Rev P4 dated 26.03.24 (Plotworks external levels) Drawing number 23-030-220 Rev P5 dated 26.03.24 (Drainage plan) Drawing number 23-030-239 Rev P2 dated 26.03.24 (Flood routing plan)"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002912,"name":"Contamination","dataset":"planning-condition","typology":"policy","reference":"U0122815","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. a) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. b) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. c) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002913,"name":"Lighting","dataset":"planning-condition","typology":"policy","reference":"U0122816","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ongoing ecological interests of the site with respect to bats in accordance with policy 30 of the Local Plan.","description":"Prior to the installation of any external lighting on site, a lighting strategy including a lux level diagram detailing all the lighting levels resulting from lighting to be installed on the site shall have been submitted and approved by the local authority. The lighting shall then be installed in accordance with the approved scheme."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002914,"name":"Air Quality","dataset":"planning-condition","typology":"policy","reference":"U0122817","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce air pollution on site in accordance with policy 54 of the Local Plan.","description":"The development shall be carried out in accordance with the mitigation measures set out in Section 11 of the Air Quality Report Number 102178V2 dated 28th January 2020 including the provision of EV charging points and cycle storage for each dwelling to be provided prior to the occupation of that dwelling."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002915,"name":"Travel Plan","dataset":"planning-condition","typology":"policy","reference":"U0122818","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To promote sustainable modes of travel in accordance with policy 13 of the Local Plan.","description":"The development shall be carried out in accordance with the measures set out in Section 5 of the submitted Travel Plan by Fore dated 19th November 2019."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002916,"name":"Play area","dataset":"planning-condition","typology":"policy","reference":"U0122819","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate play provision in accordance with policy 28 of the Local Plan.","description":"Prior to the occupation of the 50th dwelling on site, an informal play area shall have been installed and be operational on the area of open space in accordance with a scheme previously submitted to and approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002917,"name":"Construction Method Statement","dataset":"planning-condition","typology":"policy","reference":"U0122820","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety.","description":"The development hereby approved shall be carried out in strict accordance with the measures set out in the submitted Construction Environmental Management Plan Revision 002 dated 25.4.24"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002918,"name":"Highway improvement works","dataset":"planning-condition","typology":"policy","reference":"U0122821","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of highway safety and to ensure adequate visibility at the junction of Watch House Lane and Fairfield Road.","description":"No dwellings shall be occupied on site until highway improvement works, as indicated on plan reference 3798 SK001 04 rev A dated 14/10/19, have been completed in accordance with a detailed scheme previously submitted to and approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002919,"name":"Trans Pennine Trail","dataset":"planning-condition","typology":"policy","reference":"U0122822","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To encourage sustainable modes of travel in accordance with policy 13 of the Local Plan.","description":"No dwellings shall be occupied until connections to the Trans Pennine Trail as indicated on Drawing number D01 Rev N dated 29.04.24 have been provided in accordance with a scheme previously submitted to and approved in writing by the local planning authority."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2920&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2900&limit=10"},"count":5605}