{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002830,"name":"dust","dataset":"planning-condition","typology":"policy","reference":"U0122129","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of safeguarding the amenity of local occupiers.","description":"The best practicable means shall be employed to minimise the transmission and effects of dust from the site. In particular, but without prejudice to the generality of the foregoing, an adequate number of water bowsers and a water supply shall be available for the watering of roadways to lay dust, as necessary."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002831,"name":"Construction deliveries","dataset":"planning-condition","typology":"policy","reference":"U0122130","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the amenities of nearby occupiers.","description":"Deliveries to and from the site, the loading or unloading of raw materials and operational hours during the construction phase of the development shall be restricted to the hours of 07.00 and 18.00 Monday to Saturday. No deliveries or operation hours shall take place on Sundays or Bank Holidays."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002832,"name":"Drive-thru deliveries","dataset":"planning-condition","typology":"policy","reference":"U0122131","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the amenities of nearby residents","description":"No deliveries to the drive thru restaurant shall take place between Monday to Sunday between 22:00 and 07:00hrs."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002833,"name":"fan noise","dataset":"planning-condition","typology":"policy","reference":"U0122132","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the amenity of nearby dwellings.","description":"The fan noise shall be no higher than those submitted in the FAN assessment by RHF on the 8.6.16."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002834,"name":"smells","dataset":"planning-condition","typology":"policy","reference":"U0122133","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safegaurd the amenities of nearby occupiers.","description":"All cooking smells, noxious fumes or vapours from the premises shall be disposed of by means of a suitable duct carried to all cooking ranges & fryers and terminating at a point 1m above eaves level and not less than 1m above the roof ridge of any building within 20 m of the building housing the commercial kitchen.The duct shall be free from an obstruction such as a plate, cowl, or cap, or any other deflection at its termination point."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002835,"name":"list of plans","dataset":"planning-condition","typology":"policy","reference":"U0122135","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Doc. No. CBDW-BWB-ZZ-XX-CA-LE-0002_BNG Biodiversity net gain assessment Rev P04 received 01.05.24 and biodiversity net gain metric received 6.3.24. Dwg. No. 1310 001 A Biodiversity Net Gain Existing (1 of 2) received 10.01.2024 Dwg. No. 1310 002 E Biodiversity Net Gain Proposed (2 of 2) within BNG Report received 01.05.24 Dwg. No. JBA.4205.111.B Revision B Materials Plan received 12.3.24 Dwg. No. 1310 200 E Landscape softworks (sheet layout 1 of 5) received 6.3.24 Dwg. No. 1310 201 C Landscape softworks (sheet layout 2 of 5) received 6.3.24 Dwg. No. 1310 202 D Landscape softworks (sheet layout 3 of 5) received 6.3.24 Dwg. No. 1310 203 C Landscape softworks (sheet layout 4 of 5) received 6.3.24 Dwg. No. 1310 204 D Landscape softworks (sheet layout 5 of 5) received 6.3.24 Landscape and Ecological Management Plan Revision B LEMP B received 6.3.24 Dwg. No. JBA.4205.108.D Boundary Layout received 28.2.24 Dwg. No. JBA.4205.101.N Site Layout received 28.2.24 Dwg. No. 1310 401 A Typical tree station received 22.2.24 Dwg. No. 1310 402 A Typical Feathered Tree Station received 22.2.24 Dwg. No. 1310 301 A Typical Habitat Stack received 22.2.2024 Dwg. No. JBA.4205.102.E Type C2 - Category 3 2 Bed Bungalow received 10.01.24 Dwg. No. JBA.4205.103.D Type A Semi-Detached Two Bed received 10.01.24 Dwg. No. JBA.4205.104.E Type B2 Semi-Detached Three Bed received 10.01.24 Dwg. No. JBA.4205.106.C Type E 4 Bedroom Dwelling received 10.01.24 Dwg. No. JBA.4205.107.B Type D Quarter Houses received 10.01.24 Doc.No. 232734 Cross Bank Doncaster P03 Noise Assessment Issued 20231130 received 10.01.24 Dwg. No. 23015-DR-S-0302 House Type B Super-Structure P1 General Arrangement received 10.01.24 Dwg. No. 23015- DR-S-0301 House Type A&B Super-Structure General Arrangement P2 received 10.01.24 Dwg. No. 23015- DR-S-0211 House Type A&B Sub-Structure General Arrangement P2 received 10.1.24 Dwg. No. 23015- DR-S-0212 House Type C Sub-Structure General Arrangement P2 Received 10.1.24 Dwg. No. 23015- DR-S-0213 House Type D Sub-Structure General Arrangement P1 received 10.1.24 Dwg. No. 23015- DR-S-0214 House Type E Sub-Structure General Arrangement P1 received 10.01.24 Dwg. No. 23015-DR-S-0303 House Type C Super-Structure General Arrangement P2 received 10.1.24 Dwg. No. 23015-DR-S-0304 House Type D Super-Structure General Arrangement P1 received 10.1.24 Dwg. No. 23015- DR-S-0305 House Type E Super-Structure General Arrangement P1 received 10.1.24 Dwg. No. 23015- DR-S-0310 Superstructure Details P1 received 10.1.24 Dwg. No. 23015- DR-S-0500 Typical Masory Details P1 received 10.1.24 Dwg. No. 23015-DR-S-0200 Site Plan P2 received 10.1.24 Dwg. No. 23015- DR-S-0002 General Notes P1 received 10.1.24"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002836,"name":"DA01 - Drainage - Precom","dataset":"planning-condition","typology":"policy","reference":"U0122136","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems as required by Policies 56 and 57 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls based on the approved development are in place from the outset.","description":"Prior to the commencement of development, details of the foul, surface water and land drainage systems and all related works necessary to drain the site shall be submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and no dwelling shall be occupied until connected to the approved drainage system. The development shall take place in accordance with the agreed details."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002837,"name":"CTMP - Highways - Precom","dataset":"planning-condition","typology":"policy","reference":"U0122137","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"This condition is to ensure that local amenity and highway safety is protected as required by Policy 13 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset.","description":"No development shall take place, including any works of demolition, until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period and shall provide for the following and answered in the order they are written below, for ease of checking, with additional information appended at the end: i. The site compound and parking of vehicles for site operatives and visitors ii. Identification of agreed access points and routing from the Classified Road network iii. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) iv. Contract duration v. The areas for loading and unloading of plant and materials. vi. Storage of plant and materials used in constructing the development. vii. The location, erection and maintenance of any security hoarding to be installed. viii. Wheel washing facilities (location and type) ix. Measures to control noise and the emission of dust and dirt during construction. x. Temporary signage on the adopted highway"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002838,"name":"CON1 - PC - Precom","dataset":"planning-condition","typology":"policy","reference":"U0122138","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect public health and the wider environment in accordance with Policies 54 & 55 of the Local Plan. Details of the agreed contamination prevention measures are required to be in place prior to development commencing to ensure protection is in place.","description":"No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002839,"name":"Remediation Strategy - EA -Precom","dataset":"planning-condition","typology":"policy","reference":"U0122139","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not contribute to, and is not put at unacceptable risk from or adversely affected by, unacceptable levels of water pollution in accordance with Policies 54 & 55 of the Local Plan. Details of the agreed contamination prevention measures are required to be in place prior to development commencing to ensure protection is in place.","description":"No development approved by this planning permission shall commence until a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted, has been submitted to, and approved in writing by, the local planning authority. This strategy will include the following components: 1. A site investigation scheme, based on the preliminary risk assessment to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off-site. 2. The results of the site investigation and the detailed risk assessment referred to in (1) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. 3. A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (2) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action. Any changes to these components require the written consent of the local planning authority. The scheme shall be implemented as approved."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2840&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2820&limit=10"},"count":5605}