{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002750,"name":"Battery Safety Management Plan","dataset":"planning-condition","typology":"policy","reference":"U0121619","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that adequate management controls are put into place by the operator in accordance with Policies 46, 47, 57 and 58 of the Local Plan.","description":"Prior to first use of any part of the development hereby approved, a Battery Safety Management Plan (BSMP) shall be submitted to, and approved in writing by, the local planning authority. The BSMP must prescribe measures to facilitate safety during the construction, operation and decommissioning of the battery storage system, including potential risks from battery fire, theft and flooding. The BSMP shall be informed by a detailed Site-Specific Risk Information (SSRI) or other such assessment in consultation with South Yorkshire Fire Service. The BSMP shall be implemented in accordance with the agreed details at all times."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002751,"name":"Ecology - CEMP - Precom","dataset":"planning-condition","typology":"policy","reference":"U0121620","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan.","description":"Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Designated area with an impermeable ground surface where fuel transfer would take place. 3. Training required for personnel dealing with spillages and spill kits available on site. 4. Details of maintenance regime for the installed equipment to check for drips and spills. 5. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA Estrada Ecology 31/03/23 Ref:SQ-942 that may be encountered on site. 7. Details of further water vole and otter surveys prior to works commencing."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002752,"name":"Trees - Tree Protection - Precom","dataset":"planning-condition","typology":"policy","reference":"U0121621","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that all trees are protected from damage during construction as required by Policy 32 of the Local Plan. These measures are required to be installed before works are begun.","description":"The development hereby granted shall not be commenced nor materials or machinery brought onto the site until the trees which it has been agreed shall be retained are protected as shown in the approved Tree Protection Plan submitted by Selwyn Trees. Photographic evidence shall be provided to the Local Planning Authority prior to any works taking place."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002753,"name":"WSI - SYAS - Precom","dataset":"planning-condition","typology":"policy","reference":"U0121622","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that further archaeological investigation which is required is carried out prior to site works taking place in accordance with Policy 35 of the Local Plan.","description":"Part A No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: o The programme and method of site investigation and recording. o The requirement to seek preservation in situ of identified features of importance. o The programme for post-investigation assessment. o The provision to be made for analysis and reporting. o The provision to be made for publication and dissemination of the results. o The provision to be made for deposition of the archive created. o Nomination of a competent person/persons or organisation to undertake the works. o The timetable for completion of all site investigation and post-investigation works. Part B Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002754,"name":"Access alterations","dataset":"planning-condition","typology":"policy","reference":"U0121623","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of road safety as required by Policy 13 of the Local Plan.","description":"Detailed engineering drawings for the section of highway to be altered shall be submitted to and approved in writing by the Local Planning Authority before works commence on site. Any gates shall be situated at least 20.0m back from the carriageway edge of the public road and hung so as not to open outwards towards the public highway and with the area of access road within at least 20.0m of the carriageway edge of the public road surfaced in bound permeable material. The approved access shall thereafter be retained and maintained and no further structure, erection or planting exceed 900mm in height shall thereafter be placed within the visibility splays shown on the approved plans."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002755,"name":"Ecology - BNG Delivery - Precom","dataset":"planning-condition","typology":"policy","reference":"U0121624","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To fulfil specifically the requirements of Local Plan policy 30B and enhance local ecological networks in accordance with Local Plan policy 29.","description":"Prior to the commencement of development, a Management and Monitoring Plan for proposed onsite habitats shall be submitted to the Local Planning Authority for approval in writing. The Management Plan shall be based on the proposals set out in the Biodiversity Net Gain report (Estrada Ecology Ref: SQ942.1 31/05/23) and detail the following: o The baseline biodiversity assessment against which an uplift in biodiversity unit value will be monitored. o The project's biodiversity unit targets. o A detailed adaptive management plan setting out how habitats will be created or enhanced and describing the proposed ongoing management for a minimum of 30 years. o The details of when target condition will be achieved and how it shall be maintained. o A detailed monitoring plan that will be used to inform any potential changes to the ongoing management and assess the progress towards achieving target condition. This should outline the surveys that will be used to inform condition monitoring reports. Monitoring reports will be provided to the Local Planning Authority by the end of years 1,2,5,10,20, and 30 of the monitoring period. o The roles, responsibilities and professional competencies of the people involved in implementing and monitoring the biodiversity net gain delivery. o Evidence that the necessary resources are available to deliver the proposed biodiversity net gain plan and the ongoing management. Once approved the Management and Monitoring Plan shall be implemented in full and any subsequent changes to management as a result of findings from the monitoring agreed in writing with the Local Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002756,"name":"Drainage Implemented","dataset":"planning-condition","typology":"policy","reference":"U0121625","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems as required by Policies 56 and 57 of the Local Plan.","description":"No part of the development shall be brought into use until the drainage scheme has been completed in accordance with the approved details. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002757,"name":"Lighting Strategy","dataset":"planning-condition","typology":"policy","reference":"U0121626","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Policy 29 of the Local Plan.","description":"Within one month of commencement, a lighting design strategy for light-sensitive biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall show how, external lighting is specified, located and orientated so that it can be clearly demonstrated that it will not disturb or adversely affect the use of the semi-natural areas of the site and it surrounding green spaces by bats and other species of wildlife. Any luminaries used in the peripheral areas of the site adjoining areas of greenspace should be of the LED type which provide a lower intensity of light. The use of warm white spectrum (preferably 2700Kelvin) should be adopted to reduce the blue light component with a wavelength exceeding 550nm. The strategy shall be informed by the Institute of Lighting Professionals/Bat Conservation Trust, Guidance Note 08/18: Bats and Artificial Lighting in the UK. All external lighting shall be installed in accordance with the specification and locations set out in the strategy and maintained as such."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002758,"name":"Drainage - Management and Maintainance","dataset":"planning-condition","typology":"policy","reference":"U0121627","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the drainage network for the development is maintained in accordance with Policies 46 and 56 of the Local Plan.","description":"Prior to the first use of the development hereby approved, an updated drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include the following: Details of the private management company responsible for implementing the plan at all times or any successor; Findings of a watercourse CCTV survey to establish condition and a blockage assessment to be undertaken; Details of any foul drainage, such as compostable toilet, present on the site. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002759,"name":"Outfall design","dataset":"planning-condition","typology":"policy","reference":"U0121628","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network.","description":"No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2760&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2740&limit=10"},"count":5605}