{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002600,"name":"In accordance with plans","dataset":"planning-condition","typology":"policy","reference":"U0120363","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing number HG0058-PHS-CD-ZZ-SK-A-0700 Rev P04 dated 10.01.24 (Location plan) Drawing number HG0058-PHS-CD-ZZ-SK-A-0705 Rev P03 dated 10.01.24 (Proposed block plan) Drawing number HG0058-PHS-CD-OO-DR-A-0007 Rev P08 dated 21.03.24 (Proposed site plan) Drawing number HG0058-PHS-CD-ZZ-SK-A-0702 Rev P05 dated 10.01.24 (Proposed car park layout) Drawing number HG0058-PHS-CD-OO-DR-A-0009 Rev P08 dated 21.03.24 (Proposed site section elevations) Drawing number HG0058-PHS-CD-OO-SK-A-0003 Rev P06 dated 10.01.24 (Proposed site sections) Drawing number HG0058-PHS-CD-OO-DR-A-0010 Rev P07 dated 21.03.24 (Proposed elevations of CDC building) Drawing number HG0058-PHS-CD-OO-DR-A-0005 Rev P06 dated 21.03.24 (Proposed 3D images of CDC building) Drawing number HG0058-PHS-CD-OO-DR-A-0011 Rev P07 dated 21.03.24 (Proposed roof plan of CDC building) Drawing number HG0058-PHS-CD-OO-SK-A-0001 Rev P12 dated 10.01.24 (Proposed ground floor plan of CDC building) Drawing number HG0058-PHS-CD-OO-DR-A-0012 Rev P07 dated 21.03.24 (Proposed elevations of substation) Drawing number HG0058-PHS-CD-OO-DR-A-0002 Rev P07 dated 21.03.24 (Proposed floor plan of substation)"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002601,"name":"Separate systems of drainage","dataset":"planning-condition","typology":"policy","reference":"U0120364","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of satisfactory and sustainable drainage.","description":"The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002602,"name":"No piped discharge of surface water","dataset":"planning-condition","typology":"policy","reference":"U0120365","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that no surface water discharges take place until proper provision has been made for its disposal.","description":"There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to: i) evidence that other means of surface water drainage have been properly considered and why they have been discounted; and ii) the means of discharging to the public sewer network at a rate not to exceed 3.5 litres per second."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002603,"name":"Drainage management and maintenance plan","dataset":"planning-condition","typology":"policy","reference":"U0120366","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with the NPPF.","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002604,"name":"Landscaping","dataset":"planning-condition","typology":"policy","reference":"U0120367","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of environmental quality and Local Plan policy 48.","description":"Prior to above ground works, a detailed soft landscape scheme based on the approved landscape masterplan (drawing HG0058-PHS-CD-ZZ-DR-A-0710 Rev P01 dated 26.02.24) shall be submitted to and approved in writing by the Local Planning Authority. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a specification for planting including details of tree support, aeration and irrigation and details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002605,"name":"Materials","dataset":"planning-condition","typology":"policy","reference":"U0120368","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the satisfactory appearance of the development.","description":"Prior to above ground works, product details of the proposed external materials shall be submitted to and approved in writing by the Local Planning Authority. This may include submission of samples if requested by the Local Planning Authority. Unless otherwise agreed in writing with the Local Planning Authority, the development shall be carried out in accordance with the approved materials."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002606,"name":"Noise","dataset":"planning-condition","typology":"policy","reference":"U0120369","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not prejudice the local amenity.","description":"The rating level of sound emitted from any fixed plant and/or machinery associated with the development shall not exceed background sound levels between the hours of 0700-2300 (taken as a 15 minute LA90 at the boundary of nearest sound sensitive premises) and shall not exceed the background sound level between 2300-0700 (taken as a 15 minute LA90 at the boundary of nearest sound sensitive premises). All measurements shall be made in accordance with the methodology of BS4142 (2014) (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments). The background sound levels shall be taken as those established in the Apex Acoustics noise impact assessment reference 10083.1 submitted with the application. Where access to the boundary of the nearest sound sensitive property is not possible, measurements shall be undertaken at an appropriate location and corrected to establish the noise levels at the nearest sound sensitive property. Any deviations from the LA90 time interval stipulated above shall be agreed in writing with the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002607,"name":"Amended plans","dataset":"planning-condition","typology":"policy","reference":"U0120408","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Site plan: WB23_QQ_09-00-REV A. Date received: 07/03/2024 Proposed elevations: WB23_QQ_07-00-REV G. Date received: 07/03/2024 Proposed floor plans: WB23_QQ_06-00-REV L. Date received: 07/03/2024"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002608,"name":"Unexpected Contamination","dataset":"planning-condition","typology":"policy","reference":"U0120409","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002609,"name":"windows","dataset":"planning-condition","typology":"policy","reference":"U0120410","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not impact on the privacy of the adjoining premises.","description":"Before the first occupation of the building/extension hereby permitted, the windows in the annex bathroom on the approved plans shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2610&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2590&limit=10"},"count":5605}